The invention discloses a building outer wall decoration engineering construction method. The method comprises the following steps that S1, a base layer is treated; s2, preparing a construction wall surface: smearing anti-crack waterproof putty on the surface of the waterproof mortar, and polishing to be smooth; s3, setting control lines: popping up a vertical control line and a horizontal control line on the construction wall surface according to the technical requirements of a building design drawing and an external wall thermal insulation project; s4, according to the actual size of the construction wall surface, the vertical control line and the horizontal control line; and S5, according to the grid division scheme, the vertical control line and the horizontal control line, the control line of each grid of plate is popped up. Compared with the prior art, the method has the following advantages that a mounting method of bonding and anchoring is adopted, a foaming process and on-site foaming are adopted, the plates and the construction wall face are firmly bonded together, the adjacent plates are firmly bonded together, the method has the characteristics of excellent cracking resistance, water resistance, falling resistance and the like, and the mounting efficiency and quality are greatly improved.
本发明公开了一种建筑外墙装饰工程施工方法,包括以下步骤:S1基层处理;S2施工墙面准备:在防水砂浆表面涂抹抗裂防水腻子并打磨平整;S3设置控制线:根据建筑设计图纸和外墙保温工程的技术要求,在所述施工墙面上弹出垂直控制线和水平控制线;S4:根据施工墙面的实际尺寸、所述垂直控制线和所述水平控制线;S5:根据所述分格方案、所述垂直控制线和所述水平控制线,弹出每格板材的控制线。本发明具有如下优点:本发明采用了粘结加锚固的安装方法,采用发泡工艺,现场发泡,使板材与施工墙面之间,相邻板材之间牢固地粘接在一起,本方法具有极好的抗开裂、防水、抗脱落等特点,极大地提高安装效率及质量。
The invention discloses a building outer wall decoration engineering construction method. The method comprises the following steps that S1, a base layer is treated; s2, preparing a construction wall surface: smearing anti-crack waterproof putty on the surface of the waterproof mortar, and polishing to be smooth; s3, setting control lines: popping up a vertical control line and a horizontal control line on the construction wall surface according to the technical requirements of a building design drawing and an external wall thermal insulation project; s4, according to the actual size of the construction wall surface, the vertical control line and the horizontal control line; and S5, according to the grid division scheme, the vertical control line and the horizontal control line, the control line of each grid of plate is popped up. Compared with the prior art, the method has the following advantages that a mounting method of bonding and anchoring is adopted, a foaming process and on-site foaming are adopted, the plates and the construction wall face are firmly bonded together, the adjacent plates are firmly bonded together, the method has the characteristics of excellent cracking resistance, water resistance, falling resistance and the like, and the mounting efficiency and quality are greatly improved.
本发明公开了一种建筑外墙装饰工程施工方法,包括以下步骤:S1基层处理;S2施工墙面准备:在防水砂浆表面涂抹抗裂防水腻子并打磨平整;S3设置控制线:根据建筑设计图纸和外墙保温工程的技术要求,在所述施工墙面上弹出垂直控制线和水平控制线;S4:根据施工墙面的实际尺寸、所述垂直控制线和所述水平控制线;S5:根据所述分格方案、所述垂直控制线和所述水平控制线,弹出每格板材的控制线。本发明具有如下优点:本发明采用了粘结加锚固的安装方法,采用发泡工艺,现场发泡,使板材与施工墙面之间,相邻板材之间牢固地粘接在一起,本方法具有极好的抗开裂、防水、抗脱落等特点,极大地提高安装效率及质量。
Building outer wall decoration engineering construction method
一种建筑外墙装饰工程施工方法
SHAN BIN (author)
2023-06-09
Patent
Electronic Resource
Chinese
Aluminum plate curtain wall building outer wall decoration engineering construction method
European Patent Office | 2021
|Building thermal insulation outer wall decoration construction method
European Patent Office | 2021
|Construction method for outer wall decoration engineering of aluminum plate curtain wall building
European Patent Office | 2022
|Outer wall decoration frame for construction engineering
European Patent Office | 2022
|