A platform for research: civil engineering, architecture and urbanism
Soft soil foundation drainage device and drainage consolidation method
The invention relates to a soft soil foundation drainage device and a drainage consolidation method, relates to the technical field of geotechnical engineering foundation construction, and aims to solve the problem that the time for drainage consolidation of a soft soil foundation by a pre-pressing drainage consolidation method is too long, the soft soil foundation drainage device comprises a water collecting pile, and the water collecting pile comprises a drilling section and a water collecting section; the drilling section is used for drilling into a rock layer to fix the water collecting pile, the inner wall of the water collecting section is hollow, an extrusion assembly is arranged on the outer wall of the water collecting section and used for enabling water in a soft soil layer to flow into an inner cavity of the water collecting section, and a drainage assembly used for pumping out accumulated water in the water collecting section is arranged outside the water collecting pile. And the heating piles are arranged on the peripheries of the water collecting piles, heating assemblies are arranged in the heating piles, and the heating assemblies are used for drying soft soil on the peripheries of the heating piles. The drainage consolidation method has the effect of shortening the time consumed by drainage consolidation of the soft soil foundation.
本申请涉及一种软土地基排水装置及排水固结方法,涉及岩土工程地基施工技术领域,为了解决预压排水固结方法排水固结软土地基的时间过长的问题,其包括集水桩,所述集水桩包括钻进段和集水段,所述钻进段用于钻入岩石层中将集水桩固定,所述集水段内壁中空,所述集水段外壁设置有挤压组件,所述挤压组件用于将软土层中的水流入至集水段内腔中,所述集水桩外设置有用于将集水段中的积水抽出的排水组件;加热桩,所述加热桩设置在集水桩周边,所述加热桩内设置有加热组件,所述加热组件用于将加热桩周边软土烘干。本申请具有缩短软土地基排水固结所耗费时长的效果。
Soft soil foundation drainage device and drainage consolidation method
The invention relates to a soft soil foundation drainage device and a drainage consolidation method, relates to the technical field of geotechnical engineering foundation construction, and aims to solve the problem that the time for drainage consolidation of a soft soil foundation by a pre-pressing drainage consolidation method is too long, the soft soil foundation drainage device comprises a water collecting pile, and the water collecting pile comprises a drilling section and a water collecting section; the drilling section is used for drilling into a rock layer to fix the water collecting pile, the inner wall of the water collecting section is hollow, an extrusion assembly is arranged on the outer wall of the water collecting section and used for enabling water in a soft soil layer to flow into an inner cavity of the water collecting section, and a drainage assembly used for pumping out accumulated water in the water collecting section is arranged outside the water collecting pile. And the heating piles are arranged on the peripheries of the water collecting piles, heating assemblies are arranged in the heating piles, and the heating assemblies are used for drying soft soil on the peripheries of the heating piles. The drainage consolidation method has the effect of shortening the time consumed by drainage consolidation of the soft soil foundation.
本申请涉及一种软土地基排水装置及排水固结方法,涉及岩土工程地基施工技术领域,为了解决预压排水固结方法排水固结软土地基的时间过长的问题,其包括集水桩,所述集水桩包括钻进段和集水段,所述钻进段用于钻入岩石层中将集水桩固定,所述集水段内壁中空,所述集水段外壁设置有挤压组件,所述挤压组件用于将软土层中的水流入至集水段内腔中,所述集水桩外设置有用于将集水段中的积水抽出的排水组件;加热桩,所述加热桩设置在集水桩周边,所述加热桩内设置有加热组件,所述加热组件用于将加热桩周边软土烘干。本申请具有缩短软土地基排水固结所耗费时长的效果。
Soft soil foundation drainage device and drainage consolidation method
一种软土地基排水装置及排水固结方法
JIANG WENHAO (author) / JIANG LINGJIE (author)
2023-06-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soft soil foundation drainage consolidation method and drainage device
European Patent Office | 2021
|European Patent Office | 2022
|Drainage body and drainage method for drainage consolidation of soft soil body
European Patent Office | 2023
|European Patent Office | 2015
|