A platform for research: civil engineering, architecture and urbanism
Construction method for continuously paving pavement structure layer
The invention provides a construction method for continuously paving a pavement structure layer. The construction method comprises the following steps: filling a filling roadbed layer by layer and compacting layer by layer; paving a graded crushed gravel layer on the top layer of the filling roadbed, compacting the graded crushed gravel layer, and arranging a waterproof grid plate on the top of the compacted graded crushed gravel layer; paving construction of a pavement subbase layer is continuously conducted on the waterproof grid plate; the surface of the top layer of the pavement subbase is coated with an adhesive, a waterproof layer is pasted, and then paving construction of the pavement subbase is continuously conducted; and the pavement base course is completely constructed, and then paving construction of the pavement surface course is continuously carried out. The waterproof grid plate and the waterproof layer are arranged, seepage water can be prevented and controlled layer by layer, and therefore the waterproof effect of highway pavement structure layer construction is improved.
本发明提供了一种路面结构层连续铺筑的施工方法,包括:填土路基分层填筑、逐层压实;在填土路基的顶层铺筑级配碎砾石层,并进行压实,并在压实后的级配碎砾石层顶部布设防水网格板;在防水网格板上连续进行路面底基层的摊铺施工;在路面底基层的顶层的表面涂刷粘贴剂,并粘贴防水层,接着连续进行路面基层的摊铺施工;路面基层全部施工完成,紧接着连续进行路面面层的摊铺施工。本发明设置有防水网格板和防水层,可以分层次的对渗透水进行防治,从而提高公路路面结构层施工的防水效果。
Construction method for continuously paving pavement structure layer
The invention provides a construction method for continuously paving a pavement structure layer. The construction method comprises the following steps: filling a filling roadbed layer by layer and compacting layer by layer; paving a graded crushed gravel layer on the top layer of the filling roadbed, compacting the graded crushed gravel layer, and arranging a waterproof grid plate on the top of the compacted graded crushed gravel layer; paving construction of a pavement subbase layer is continuously conducted on the waterproof grid plate; the surface of the top layer of the pavement subbase is coated with an adhesive, a waterproof layer is pasted, and then paving construction of the pavement subbase is continuously conducted; and the pavement base course is completely constructed, and then paving construction of the pavement surface course is continuously carried out. The waterproof grid plate and the waterproof layer are arranged, seepage water can be prevented and controlled layer by layer, and therefore the waterproof effect of highway pavement structure layer construction is improved.
本发明提供了一种路面结构层连续铺筑的施工方法,包括:填土路基分层填筑、逐层压实;在填土路基的顶层铺筑级配碎砾石层,并进行压实,并在压实后的级配碎砾石层顶部布设防水网格板;在防水网格板上连续进行路面底基层的摊铺施工;在路面底基层的顶层的表面涂刷粘贴剂,并粘贴防水层,接着连续进行路面基层的摊铺施工;路面基层全部施工完成,紧接着连续进行路面面层的摊铺施工。本发明设置有防水网格板和防水层,可以分层次的对渗透水进行防治,从而提高公路路面结构层施工的防水效果。
Construction method for continuously paving pavement structure layer
一种路面结构层连续铺筑的施工方法
JIANG ZIQIANG (author) / LI SHUAI (author) / ZHANG LELING (author) / LIU ZHAOBAO (author) / WANG SHANZHENG (author) / ZHAO YAQI (author) / MIN HUI (author) / ZHANG MEIDONG (author) / LI YULIANG (author) / LU TONGWEI (author)
2023-06-23
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Anti-rut pavement paving method capable of continuously paving base layer and surface layer
European Patent Office | 2020
|Pavement wearing layer paving device and construction method
European Patent Office | 2024
|Pavement construction paving device and paving method thereof
European Patent Office | 2024
|