A platform for research: civil engineering, architecture and urbanism
Bailey beam mounting equipment and method for trestle system
The invention discloses bailey beam mounting equipment and method for a trestle system, and the bailey beam mounting equipment comprises a crawler crane main body, the top of the crawler crane main body is provided with a hoisting steel rope, the bottom of the hoisting steel rope is fixedly connected with a hoisting beam assembly, and the bottom of the hoisting beam assembly is provided with two stabilizing assemblies; the bottom of the hoisting beam assembly is slidably connected with two fixing assemblies, the hoisting beam assembly comprises a hoisting beam body, the interior of the hoisting beam body is rotatably connected with a threaded rod, and the surface of the threaded rod is in meshing transmission with a second bevel gear through a first bevel gear. The technical problems that the overall stability of the bailey beam in the hoisting process cannot be guaranteed through single steel rope fixing, and meanwhile, the steel rope fixing mode is troublesome in operation are solved, through mutual cooperation of the stabilizing assembly and the fixing assembly, on one hand, rapid fixing operation of the overall bailey beam is achieved, and on the other hand, the overall stability of the bailey beam is guaranteed. And on the other hand, the stability of the bailey beam in the hoisting process can be improved.
本发明公开了一种栈桥系统使用的贝雷梁安装设备及安装方法,包括履带吊车主体,履带吊车主体的顶部设置有吊运钢绳索,吊运钢绳索的底部固定连接有吊运梁组件,吊运梁组件的底部设置有两个稳定组件,吊运梁组件的底部滑动连接有两个固定组件,吊运梁组件包括吊运梁主体,吊运梁主体的内部转动连接有螺纹杆,螺纹杆的表面通过第一锥齿轮啮合传动有第二锥齿轮,涉及桥面系施工安装技术领域,解决单一的钢绳索固定不能保证吊运过程中贝雷梁整体的稳定性,同时钢绳索固定的方式操作麻烦的技术问题,通过设置的稳定组件和固定组件的互相配合,一方面实现对贝雷梁整体的快速固定操作,另一方面可以提高贝雷梁在吊运过程中的稳定性。
Bailey beam mounting equipment and method for trestle system
The invention discloses bailey beam mounting equipment and method for a trestle system, and the bailey beam mounting equipment comprises a crawler crane main body, the top of the crawler crane main body is provided with a hoisting steel rope, the bottom of the hoisting steel rope is fixedly connected with a hoisting beam assembly, and the bottom of the hoisting beam assembly is provided with two stabilizing assemblies; the bottom of the hoisting beam assembly is slidably connected with two fixing assemblies, the hoisting beam assembly comprises a hoisting beam body, the interior of the hoisting beam body is rotatably connected with a threaded rod, and the surface of the threaded rod is in meshing transmission with a second bevel gear through a first bevel gear. The technical problems that the overall stability of the bailey beam in the hoisting process cannot be guaranteed through single steel rope fixing, and meanwhile, the steel rope fixing mode is troublesome in operation are solved, through mutual cooperation of the stabilizing assembly and the fixing assembly, on one hand, rapid fixing operation of the overall bailey beam is achieved, and on the other hand, the overall stability of the bailey beam is guaranteed. And on the other hand, the stability of the bailey beam in the hoisting process can be improved.
本发明公开了一种栈桥系统使用的贝雷梁安装设备及安装方法,包括履带吊车主体,履带吊车主体的顶部设置有吊运钢绳索,吊运钢绳索的底部固定连接有吊运梁组件,吊运梁组件的底部设置有两个稳定组件,吊运梁组件的底部滑动连接有两个固定组件,吊运梁组件包括吊运梁主体,吊运梁主体的内部转动连接有螺纹杆,螺纹杆的表面通过第一锥齿轮啮合传动有第二锥齿轮,涉及桥面系施工安装技术领域,解决单一的钢绳索固定不能保证吊运过程中贝雷梁整体的稳定性,同时钢绳索固定的方式操作麻烦的技术问题,通过设置的稳定组件和固定组件的互相配合,一方面实现对贝雷梁整体的快速固定操作,另一方面可以提高贝雷梁在吊运过程中的稳定性。
Bailey beam mounting equipment and method for trestle system
一种栈桥系统使用的贝雷梁安装设备及安装方法
TAN BOSHENG (author) / TANG XIANGCHUN (author) / WANG YAXIONG (author) / LIU ZHICHUAN (author) / CHEN XIAOQING (author) / FENG ZHENG (author) / HUANG LONG (author) / LI ZHITANG (author) / CHEN FEI (author) / WU YUN (author)
2023-06-23
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bailey steel trestle transverse turning connecting structure
European Patent Office | 2021
|Design and construction method of large-span bailey steel trestle
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2023
|