Cyclic construction method for temporary drainage ditch of project
The invention discloses a cyclic construction method for engineering temporary drainage ditches. The cyclic construction method comprises the steps of trench excavation, concrete cushion layer pouring, PE drainage ditch laying, prefabricated drainage ditch connector fixing device mounting, soil filling operation and concrete slope surface pouring. The concrete slope surface is removed, and soil bodies on the two sides of the PE drainage ditch are excavated; dismounting and recovering the prefabricated drainage ditch interface fixing device; and disassembling and recycling the PE drainage ditch. According to the cyclic construction method for the engineering temporary drainage ditch, the connector part of the drainage ditch can be protected, inward extrusion and outward deformation of the connector part of the drainage ditch during operation are prevented, deviation, water leakage or damage of the connector part are avoided, recycling of the PE drainage ditch is facilitated, and the purpose of environmental protection is achieved.
本发明公开了工程临时排水沟循环施工方法,包括开挖沟槽,浇筑混凝土垫层,铺设PE排水沟,安装预制排水沟接口固定装置,填土作业,浇筑混凝土坡面;拆除混凝土坡面,开挖PE排水沟两侧的土体;拆卸并回收预制排水沟接口固定装置;拆卸并回收PE排水沟。本发明的工程临时排水沟循环施工方法可实现对排水沟的接口部位进行保护,防止运行期间排水沟接口处向内挤压、向外变形,避免接口处偏移、漏水或遭受破坏,有助于实现PE排水沟的回收再使用,达到绿色环保的目的。
Cyclic construction method for temporary drainage ditch of project
The invention discloses a cyclic construction method for engineering temporary drainage ditches. The cyclic construction method comprises the steps of trench excavation, concrete cushion layer pouring, PE drainage ditch laying, prefabricated drainage ditch connector fixing device mounting, soil filling operation and concrete slope surface pouring. The concrete slope surface is removed, and soil bodies on the two sides of the PE drainage ditch are excavated; dismounting and recovering the prefabricated drainage ditch interface fixing device; and disassembling and recycling the PE drainage ditch. According to the cyclic construction method for the engineering temporary drainage ditch, the connector part of the drainage ditch can be protected, inward extrusion and outward deformation of the connector part of the drainage ditch during operation are prevented, deviation, water leakage or damage of the connector part are avoided, recycling of the PE drainage ditch is facilitated, and the purpose of environmental protection is achieved.
本发明公开了工程临时排水沟循环施工方法,包括开挖沟槽,浇筑混凝土垫层,铺设PE排水沟,安装预制排水沟接口固定装置,填土作业,浇筑混凝土坡面;拆除混凝土坡面,开挖PE排水沟两侧的土体;拆卸并回收预制排水沟接口固定装置;拆卸并回收PE排水沟。本发明的工程临时排水沟循环施工方法可实现对排水沟的接口部位进行保护,防止运行期间排水沟接口处向内挤压、向外变形,避免接口处偏移、漏水或遭受破坏,有助于实现PE排水沟的回收再使用,达到绿色环保的目的。
Cyclic construction method for temporary drainage ditch of project
工程临时排水沟循环施工方法
YANG ZHUOCHENG (author) / SHEN JIANQUAN (author) / LIU NING (author) / CHEN ZEWEN (author) / WU RONGPENG (author) / BAI CHUNHAO (author) / LEI XIA (author) / ZHANG JIANAN (author) / WANG RUIYING (author) / LIN HUANWEI (author)
2023-06-23
Patent
Electronic Resource
Chinese
Cyclic construction method for temporary drainage ditch of project
European Patent Office | 2023
|European Patent Office | 2020
|