Roof waterproof layer construction method
The invention relates to the technical field of house construction, in particular to a roof waterproof layer construction method which comprises the following steps: S1, preparation work: cleaning a roof; s2, making a slope, making a highest control point and a lowest control point, then filling cement mortar, and making a transition surface at an included angle between the cement mortar and the wall surface; s3, waterproof construction is conducted, specifically, the slope surface is coated with a waterproof material, then waterproof coiled materials are laid, and a water storage test is conducted after laying is completed; s4, heat preservation construction is conducted, and heat preservation plates are laid; and S5, a roof protection layer is constructed, a reinforcing mesh is erected, concrete is poured, and film pasting and curing are conducted. The waterproof structure has the effect of keeping the waterproof effect.
本申请涉及房屋施工的技术领域,尤其是涉及一种屋面防水层施工方法,其包括以下步骤:S1、准备工作,对屋面进行清理工作;S2、找坡,作出最高最低控制点,然后进行水泥砂浆填充,并在与墙面的夹角处,做过渡面;S3、防水施工,在坡面上涂刷防水材料,然后进行防水卷材的铺设,铺设完毕后进行蓄水试验;S4、保温施工,铺设保温板;S5、屋面保护层施工,架设钢筋网片,浇筑混凝土,贴膜养护。本申请具有使得防水效果得以保持的效果。
Roof waterproof layer construction method
The invention relates to the technical field of house construction, in particular to a roof waterproof layer construction method which comprises the following steps: S1, preparation work: cleaning a roof; s2, making a slope, making a highest control point and a lowest control point, then filling cement mortar, and making a transition surface at an included angle between the cement mortar and the wall surface; s3, waterproof construction is conducted, specifically, the slope surface is coated with a waterproof material, then waterproof coiled materials are laid, and a water storage test is conducted after laying is completed; s4, heat preservation construction is conducted, and heat preservation plates are laid; and S5, a roof protection layer is constructed, a reinforcing mesh is erected, concrete is poured, and film pasting and curing are conducted. The waterproof structure has the effect of keeping the waterproof effect.
本申请涉及房屋施工的技术领域,尤其是涉及一种屋面防水层施工方法,其包括以下步骤:S1、准备工作,对屋面进行清理工作;S2、找坡,作出最高最低控制点,然后进行水泥砂浆填充,并在与墙面的夹角处,做过渡面;S3、防水施工,在坡面上涂刷防水材料,然后进行防水卷材的铺设,铺设完毕后进行蓄水试验;S4、保温施工,铺设保温板;S5、屋面保护层施工,架设钢筋网片,浇筑混凝土,贴膜养护。本申请具有使得防水效果得以保持的效果。
Roof waterproof layer construction method
一种屋面防水层施工方法
AN PENG (author) / ZHUANG YINGYING (author) / MA JIXIANG (author)
2023-06-23
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Waterproof roof and construction method of waterproof roof
European Patent Office | 2024
|Waterproof roof and construction method of waterproof roof
European Patent Office | 2020
|Waterproof roof and construction method of waterproof roof
European Patent Office | 2024
|Waterproof roof and construction method of waterproof roof
European Patent Office | 2021
|Heat-preservation waterproof roof construction structure, waterproof roof and construction method
European Patent Office | 2021
|