A platform for research: civil engineering, architecture and urbanism
Column structure of steel cover beam composite structure
The invention discloses a steel cover beam composite structure stand column structure, and relates to the technical field of pier construction, the steel cover beam composite structure stand column structure comprises a steel cover beam, composite structure stand columns and cover beam assembly temporary supports, the bottom of the steel cover beam is provided with at least two composite structure stand columns, the bottoms of the two ends of the steel cover beam are provided with two cover beam assembly temporary supports, and the steel cover beam comprises a plurality of steel cover beam sections. The multiple steel cover beams are linearly arranged, cover beam assembling temporary supports are arranged at the bottoms of the two steel cover beam sections located at the two ends, and a combined structure stand column is arranged at the bottom of the steel cover beam section located in the middle. The prefabricated assembly technology is adopted, the construction speed is high, the construction period can be greatly shortened, and the influence on traffic in the construction period is reduced; and by adopting the steel cover beam, not only can the assembly, industrialization and rapid construction of the cover beam structure be realized, but also a series of problems caused by overlarge hoisting weight of the concrete cover beam can be effectively solved. And the problem of connection between the stand column and the cover beam is well solved by the stand column with the combined structure.
本发明公开了一种钢盖梁组合结构立柱结构,涉及到桥墩建造技术领域,包括钢盖梁、组合结构立柱和盖梁拼装临时支撑,钢盖梁的底部设有至少两个组合结构立柱,钢盖梁的两端底部设有两盖梁拼装临时支撑,钢盖梁包括若干钢盖梁节段,若干钢盖梁呈线性排布,其中,位于两端部的两钢盖梁节段的底部设有盖梁拼装临时支撑,位于中部的钢盖梁节段的底部设有组合结构立柱。本发明中采用预制拼装技术,施工速度快,可以大大缩短工期,减少了施工期间对交通的影响;而采用钢盖梁不仅能实现盖梁结构的装配化、工业化、快速化施工,而且可以有效解决混凝土盖梁吊重过大引起的一系列问题。而组合结构立柱很好地解决了立柱与盖梁连接的问题。
Column structure of steel cover beam composite structure
The invention discloses a steel cover beam composite structure stand column structure, and relates to the technical field of pier construction, the steel cover beam composite structure stand column structure comprises a steel cover beam, composite structure stand columns and cover beam assembly temporary supports, the bottom of the steel cover beam is provided with at least two composite structure stand columns, the bottoms of the two ends of the steel cover beam are provided with two cover beam assembly temporary supports, and the steel cover beam comprises a plurality of steel cover beam sections. The multiple steel cover beams are linearly arranged, cover beam assembling temporary supports are arranged at the bottoms of the two steel cover beam sections located at the two ends, and a combined structure stand column is arranged at the bottom of the steel cover beam section located in the middle. The prefabricated assembly technology is adopted, the construction speed is high, the construction period can be greatly shortened, and the influence on traffic in the construction period is reduced; and by adopting the steel cover beam, not only can the assembly, industrialization and rapid construction of the cover beam structure be realized, but also a series of problems caused by overlarge hoisting weight of the concrete cover beam can be effectively solved. And the problem of connection between the stand column and the cover beam is well solved by the stand column with the combined structure.
本发明公开了一种钢盖梁组合结构立柱结构,涉及到桥墩建造技术领域,包括钢盖梁、组合结构立柱和盖梁拼装临时支撑,钢盖梁的底部设有至少两个组合结构立柱,钢盖梁的两端底部设有两盖梁拼装临时支撑,钢盖梁包括若干钢盖梁节段,若干钢盖梁呈线性排布,其中,位于两端部的两钢盖梁节段的底部设有盖梁拼装临时支撑,位于中部的钢盖梁节段的底部设有组合结构立柱。本发明中采用预制拼装技术,施工速度快,可以大大缩短工期,减少了施工期间对交通的影响;而采用钢盖梁不仅能实现盖梁结构的装配化、工业化、快速化施工,而且可以有效解决混凝土盖梁吊重过大引起的一系列问题。而组合结构立柱很好地解决了立柱与盖梁连接的问题。
Column structure of steel cover beam composite structure
一种钢盖梁组合结构立柱结构
JIANG YINLONG (author)
2023-06-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Support-free pier column underpinning steel cover beam structure
European Patent Office | 2024
|