A platform for research: civil engineering, architecture and urbanism
Foundation pit deformation early warning system
The invention discloses a foundation pit deformation early warning system, and relates to the technical field of foundation pit deformation early warning, the foundation pit deformation early warning system comprises a main control early warning assembly, one end of the main control early warning assembly is provided with a lifting assembly, the bottom of the lifting assembly is provided with a measuring assembly, and the bottom of the main control early warning assembly is provided with a moving assembly; a temperature sensor is arranged at the top of the master control early warning assembly, a humidity sensor is installed on one side of the temperature sensor, a measuring instrument is installed at the top of the master control early warning assembly, and a rain gauge is installed at the top of the measuring instrument and arranged on the side of the humidity sensor. A soil pressure meter, a steel bar stress sensor, an underground water level meter, an inclination measuring sensor, a camera, a pore water pressure meter and the like are installed on the measuring assembly, and the device is used for collecting three-dimensional coordinates, rainfall, pore water pressure, pile wall soil pressure, pile wall internal force, underground water level, crack size, soil displacement and video data of a certain observation point of a foundation pit.
本发明公开了一种基坑变形预警系统,涉及基坑变形预警技术领域,包括主控预警组件,所述主控预警组件的一端设置有升降组件,所述升降组件的底部安装有测量组件,所述主控预警组件的底部安装有移动组件,所述主控预警组件的顶部设置有温度传感器,所述温度传感器的一侧安装有湿度传感器,所述主控预警组件的顶部安装有测量仪,所述测量仪的顶部安装有雨量计,所述雨量计设置在湿度传感器的侧方。本发明通过在测量组件上安装有土压力计、钢筋应力传感器、地下水位计、测斜传感器、摄像头和孔隙水压力计等,用于实现基坑某观测点的三维坐标、雨量、孔隙水压力、桩墙土压力、桩墙内力、地下水位、裂缝大小、土体位移和视频数据的采集。
Foundation pit deformation early warning system
The invention discloses a foundation pit deformation early warning system, and relates to the technical field of foundation pit deformation early warning, the foundation pit deformation early warning system comprises a main control early warning assembly, one end of the main control early warning assembly is provided with a lifting assembly, the bottom of the lifting assembly is provided with a measuring assembly, and the bottom of the main control early warning assembly is provided with a moving assembly; a temperature sensor is arranged at the top of the master control early warning assembly, a humidity sensor is installed on one side of the temperature sensor, a measuring instrument is installed at the top of the master control early warning assembly, and a rain gauge is installed at the top of the measuring instrument and arranged on the side of the humidity sensor. A soil pressure meter, a steel bar stress sensor, an underground water level meter, an inclination measuring sensor, a camera, a pore water pressure meter and the like are installed on the measuring assembly, and the device is used for collecting three-dimensional coordinates, rainfall, pore water pressure, pile wall soil pressure, pile wall internal force, underground water level, crack size, soil displacement and video data of a certain observation point of a foundation pit.
本发明公开了一种基坑变形预警系统,涉及基坑变形预警技术领域,包括主控预警组件,所述主控预警组件的一端设置有升降组件,所述升降组件的底部安装有测量组件,所述主控预警组件的底部安装有移动组件,所述主控预警组件的顶部设置有温度传感器,所述温度传感器的一侧安装有湿度传感器,所述主控预警组件的顶部安装有测量仪,所述测量仪的顶部安装有雨量计,所述雨量计设置在湿度传感器的侧方。本发明通过在测量组件上安装有土压力计、钢筋应力传感器、地下水位计、测斜传感器、摄像头和孔隙水压力计等,用于实现基坑某观测点的三维坐标、雨量、孔隙水压力、桩墙土压力、桩墙内力、地下水位、裂缝大小、土体位移和视频数据的采集。
Foundation pit deformation early warning system
一种基坑变形预警系统
HUANG TING (author) / YAO ZHENGQI (author) / YANG ZENGPENG (author) / MENG ZIHAN (author)
2023-07-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
F16M
Rahmen, Gehäuse oder Grundplatten von Kraftmaschinen oder anderen Maschinen oder von Apparaten, nicht auf eine besondere Art von Maschine oder Apparat eingeschränkt, die anderweitig vorgesehen ist
,
FRAMES, CASINGS, OR BEDS, OF ENGINES OR OTHER MACHINES OR APPARATUS, NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUS PROVIDED FOR ELSEWHERE
/
G01D
MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE
,
Anzeigen oder Aufzeichnen in Verbindung mit Messen allgemein
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
Early warning device and early warning method for monitoring deformation of foundation pit
European Patent Office | 2022
|Foundation pit deformation early warning method, system and device based on photogrammetry
European Patent Office | 2024
|Health state assessment and early warning method for pile foundation structure deformation
European Patent Office | 2024
|Early warning method of foundation pit dewatering water level safety early warning system
European Patent Office | 2023
|Foundation pit deformation monitoring and early warning method based on machine vision
European Patent Office | 2021
|