Fabricated building and construction method thereof
The invention provides a fabricated building and a construction method thereof, and relates to the technical field of fabricated constructions.The fabricated building comprises a floor, an outer wall and butt joint ribs, a first barrel is arranged in the floor, a second barrel is arranged in the outer wall, the first barrel and the second barrel are communicated to form an L-shaped pouring cavity, and the L-shaped pouring cavity comprises a horizontal section and a vertical section; the horizontal section and the vertical section are parallel to the floor slab and the outer wall correspondingly, and butt joint ribs and concrete filler are arranged in the L-shaped pouring cavity. The butt joint rib comprises a first rib body and a second rib body, the first rib body and the second rib body are connected in an inserted mode and arranged in the second barrel body and the first barrel body respectively, and the first rib body and the second rib body are provided with a first supporting rib and a second supporting rib respectively. The first supporting rib abuts against the inner wall of the second barrel, and the second supporting rib abuts against the inner wall of the first barrel. The concrete filler forms a whole after the L-shaped pouring cavity is filled with the concrete filler, and therefore the connecting strength between the floor slab and the outer wall can be improved.
本发明提供了一种装配式建筑及其施工方法,涉及装配式建筑技术领域,包括楼板、外墙与对接筋,楼板内设有第一筒体,外墙内设有第二筒体,第一筒体与第二筒体连通形成L形浇筑腔体,L形浇筑腔体包括水平段与竖直段,水平段与竖直段分别与楼板与外墙平行,L形浇筑腔体内设有对接筋与混凝土填料;对接筋包括第一筋体与第二筋体,第一筋体与第二筋体插接且分别设于第二筒体与第一筒体中,第一筋体与第二筋体上分别设有第一支筋与第二支筋;第一支筋抵接于第二筒体内壁,第二支筋抵接于第一筒体内壁。本发明中的混凝土填料在灌满L形浇筑腔体后形成一个整体,从而能够提高楼板与外墙之间的连接强度。
Fabricated building and construction method thereof
The invention provides a fabricated building and a construction method thereof, and relates to the technical field of fabricated constructions.The fabricated building comprises a floor, an outer wall and butt joint ribs, a first barrel is arranged in the floor, a second barrel is arranged in the outer wall, the first barrel and the second barrel are communicated to form an L-shaped pouring cavity, and the L-shaped pouring cavity comprises a horizontal section and a vertical section; the horizontal section and the vertical section are parallel to the floor slab and the outer wall correspondingly, and butt joint ribs and concrete filler are arranged in the L-shaped pouring cavity. The butt joint rib comprises a first rib body and a second rib body, the first rib body and the second rib body are connected in an inserted mode and arranged in the second barrel body and the first barrel body respectively, and the first rib body and the second rib body are provided with a first supporting rib and a second supporting rib respectively. The first supporting rib abuts against the inner wall of the second barrel, and the second supporting rib abuts against the inner wall of the first barrel. The concrete filler forms a whole after the L-shaped pouring cavity is filled with the concrete filler, and therefore the connecting strength between the floor slab and the outer wall can be improved.
本发明提供了一种装配式建筑及其施工方法,涉及装配式建筑技术领域,包括楼板、外墙与对接筋,楼板内设有第一筒体,外墙内设有第二筒体,第一筒体与第二筒体连通形成L形浇筑腔体,L形浇筑腔体包括水平段与竖直段,水平段与竖直段分别与楼板与外墙平行,L形浇筑腔体内设有对接筋与混凝土填料;对接筋包括第一筋体与第二筋体,第一筋体与第二筋体插接且分别设于第二筒体与第一筒体中,第一筋体与第二筋体上分别设有第一支筋与第二支筋;第一支筋抵接于第二筒体内壁,第二支筋抵接于第一筒体内壁。本发明中的混凝土填料在灌满L形浇筑腔体后形成一个整体,从而能够提高楼板与外墙之间的连接强度。
Fabricated building and construction method thereof
一种装配式建筑及其施工方法