A platform for research: civil engineering, architecture and urbanism
Fabricated building supporting device
The invention discloses an assembly type building supporting device which comprises a wall body assembly, a first supporting assembly is arranged on one side of the wall body assembly, a containing assembly is arranged on the side face of the wall body assembly, a second supporting assembly is arranged on the other side of the wall body assembly, an ash removal assembly is fixedly installed at the top end of the wall body assembly, and the first supporting assembly comprises a foundation positioning plate. Shaft supporting plates are fixedly installed on the two sides of the upper end of the foundation positioning plate, a first movable shaft is movably connected between the shaft supporting plates in a sleeved mode, the first movable shaft is fixedly connected with one end of a first piston shaft, an electric heating resistance block is arranged at the other end of the first piston shaft, the first piston shaft is movably connected with a first piston cylinder in a sleeved mode, and a sleeve shaft is fixedly connected to the tail end of the first piston cylinder. The assembly type building supporting device has the deformation capacity in the supporting process, the device can increase the environment temperature when slurry overflows and is used for containing the slurry, the situation that the slurry is rapidly condensed and inconvenient to treat is prevented, and finally the device further has a certain dust removing function.
本发明公开了一种装配式建筑支护装置,包括墙体组件,墙体组件的一侧设有第一支护组件,墙体组件的侧面设有盛接组件,墙体组件的另一侧设有第二支护组件,墙体组件的顶端固定安装有清灰组件,第一支护组件包括有地基定位板,地基定位板的上端两侧固定安装有轴支板,轴支板之间活动套接有第一活动轴,第一活动轴固定连接有第一活塞轴一端,第一活塞轴的另一端设有电热阻块,第一活塞轴活动套接有第一活塞筒,第一活塞筒的末端固定连接有套轴,套轴活动套接有连接轴,该装配式建筑支护装置具备支护过程中的形变能力,且该装置可以提升浆液溢出以及盛接时的环境温度,防止其快速凝结不便处理,最后该装置还具备一定的灰尘清除功能。
Fabricated building supporting device
The invention discloses an assembly type building supporting device which comprises a wall body assembly, a first supporting assembly is arranged on one side of the wall body assembly, a containing assembly is arranged on the side face of the wall body assembly, a second supporting assembly is arranged on the other side of the wall body assembly, an ash removal assembly is fixedly installed at the top end of the wall body assembly, and the first supporting assembly comprises a foundation positioning plate. Shaft supporting plates are fixedly installed on the two sides of the upper end of the foundation positioning plate, a first movable shaft is movably connected between the shaft supporting plates in a sleeved mode, the first movable shaft is fixedly connected with one end of a first piston shaft, an electric heating resistance block is arranged at the other end of the first piston shaft, the first piston shaft is movably connected with a first piston cylinder in a sleeved mode, and a sleeve shaft is fixedly connected to the tail end of the first piston cylinder. The assembly type building supporting device has the deformation capacity in the supporting process, the device can increase the environment temperature when slurry overflows and is used for containing the slurry, the situation that the slurry is rapidly condensed and inconvenient to treat is prevented, and finally the device further has a certain dust removing function.
本发明公开了一种装配式建筑支护装置,包括墙体组件,墙体组件的一侧设有第一支护组件,墙体组件的侧面设有盛接组件,墙体组件的另一侧设有第二支护组件,墙体组件的顶端固定安装有清灰组件,第一支护组件包括有地基定位板,地基定位板的上端两侧固定安装有轴支板,轴支板之间活动套接有第一活动轴,第一活动轴固定连接有第一活塞轴一端,第一活塞轴的另一端设有电热阻块,第一活塞轴活动套接有第一活塞筒,第一活塞筒的末端固定连接有套轴,套轴活动套接有连接轴,该装配式建筑支护装置具备支护过程中的形变能力,且该装置可以提升浆液溢出以及盛接时的环境温度,防止其快速凝结不便处理,最后该装置还具备一定的灰尘清除功能。
Fabricated building supporting device
一种装配式建筑支护装置
LIU ZHIYONG (author) / NIU HONGLEI (author) / MA QIANJIN (author) / GAO ZHONGYING (author) / HE QIANG (author)
2023-07-04
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|