Vacuum dewatering cement mixing pile roadbed treatment construction method
The invention relates to a vacuum dewatering cement mixing pile roadbed treatment construction method which comprises the following steps: S1, construction preparation: cleaning and flattening a road range site, and setting a dewatering drilling area and a cement mixing pile construction area; s2, drilling and pipe burying are conducted, specifically, in the range of the dewatering drilling area, a vacuum dewatering well is drilled, a well point pipe and a water collecting header pipe are buried, and a vacuum pump is arranged; s3, a cement mixing pile is constructed, a drilling machine is used for guniting, stirring, sinking and lifting, and stirring, sinking and lifting are repeated; and S4, pile heads are broken and removed, a 12% lime soil cushion layer with the thickness of 0.5 m is replaced and filled, a bidirectional geogrid is laid in the middle of the cushion layer, qualified plain soil is filled above the bidirectional geogrid, and a soil roadbed is formed through layered compaction. Compared with the prior art, the construction method provided by the invention has the advantages that before cement mixing pile construction, the vacuum well points are arranged on the proposed site for dewatering, so that the water content of a roadbed soil body to be reinforced is reduced, the water level is reduced, dissipation of cement grout along with water flow is reduced, and the pile forming quality is ensured.
本发明涉及一种真空降水水泥搅拌桩路基处理施工方法,包括如下步骤:S1、施工准备,将道路范围场地清理平整,设置降水钻孔区及水泥搅拌桩施工区域;S2、钻孔埋管,在降水钻孔区范围内,钻孔设置真空降水井,埋设井点管、集水总管,设置真空泵;S3、水泥搅拌桩施工,钻机喷浆搅拌下沉、提升,重复搅拌下沉、提升;S4、破除桩头,换填0.5m厚12%石灰土垫层,垫层中间铺设一道双向土工格栅,上方填筑合格素土,分层压实形成土路床。与现有技术相比,本发明提供的施工方法通过在进行水泥搅拌桩施工前,先对拟建场地布置真空井点进行降水,降低待加固路基土体的含水量,降低水位减少水泥浆液随水流的消散,确保成桩质量。
Vacuum dewatering cement mixing pile roadbed treatment construction method
The invention relates to a vacuum dewatering cement mixing pile roadbed treatment construction method which comprises the following steps: S1, construction preparation: cleaning and flattening a road range site, and setting a dewatering drilling area and a cement mixing pile construction area; s2, drilling and pipe burying are conducted, specifically, in the range of the dewatering drilling area, a vacuum dewatering well is drilled, a well point pipe and a water collecting header pipe are buried, and a vacuum pump is arranged; s3, a cement mixing pile is constructed, a drilling machine is used for guniting, stirring, sinking and lifting, and stirring, sinking and lifting are repeated; and S4, pile heads are broken and removed, a 12% lime soil cushion layer with the thickness of 0.5 m is replaced and filled, a bidirectional geogrid is laid in the middle of the cushion layer, qualified plain soil is filled above the bidirectional geogrid, and a soil roadbed is formed through layered compaction. Compared with the prior art, the construction method provided by the invention has the advantages that before cement mixing pile construction, the vacuum well points are arranged on the proposed site for dewatering, so that the water content of a roadbed soil body to be reinforced is reduced, the water level is reduced, dissipation of cement grout along with water flow is reduced, and the pile forming quality is ensured.
本发明涉及一种真空降水水泥搅拌桩路基处理施工方法,包括如下步骤:S1、施工准备,将道路范围场地清理平整,设置降水钻孔区及水泥搅拌桩施工区域;S2、钻孔埋管,在降水钻孔区范围内,钻孔设置真空降水井,埋设井点管、集水总管,设置真空泵;S3、水泥搅拌桩施工,钻机喷浆搅拌下沉、提升,重复搅拌下沉、提升;S4、破除桩头,换填0.5m厚12%石灰土垫层,垫层中间铺设一道双向土工格栅,上方填筑合格素土,分层压实形成土路床。与现有技术相比,本发明提供的施工方法通过在进行水泥搅拌桩施工前,先对拟建场地布置真空井点进行降水,降低待加固路基土体的含水量,降低水位减少水泥浆液随水流的消散,确保成桩质量。
Vacuum dewatering cement mixing pile roadbed treatment construction method
一种真空降水水泥搅拌桩路基处理施工方法
FANG XIANGSHENG (author) / HU ZHIHONG (author) / LIANG YUDAN (author) / WU HUAIZU (author) / ZHANG QING (author) / CHEN SHUPENG (author)
2023-07-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Large-area deep soft roadbed cement mixing pile reinforcing structure
European Patent Office | 2024
|Roadbed treatment method based on vacuum dewatering combined with dynamic compaction
European Patent Office | 2020
|Cement mixing pile machine and cement mixing pile construction method
European Patent Office | 2024
|