A platform for research: civil engineering, architecture and urbanism
Large-span double-stand-column-unit curtain wall system and installation and construction method thereof
The invention discloses a large-span double-stand-column-unit curtain wall system and an installation and construction method thereof, and belongs to the technical field of curtain wall systems. The large-span double-stand-column-unit-body curtain wall system comprises two stand columns arranged in a spaced mode. Each installation assembly is correspondingly installed on one stand column and used for fixing the curtain wall unit; the two supporting assemblies are correspondingly connected between the two mounting assemblies and the two stand columns and used for supporting and positioning the mounting assemblies; and the connecting assemblies are correspondingly mounted at the ends, close to each other, of the two mounting assemblies and used for connecting the mounting assemblies. The curtain wall system can be synchronously installed on all floors, the curtain wall units do not need to be hoisted one by one through hoisting equipment, and the installation efficiency of the curtain wall units is greatly improved.
本发明公开了一种大跨度双立柱单元体幕墙系统及其安装施工方法,属于幕墙系统技术领域。本发明的大跨度双立柱单元体幕墙系统,包括:间隔设置的两个立柱;两个安装组件,每个安装组件分别对应安装于其中一个立柱上,并用于对幕墙单元进行固定;两个支撑组件,对应连接于两个安装组件与两个立柱之间,用于对安装组件进行支撑和定位;以及连接组件,对应安装于两个安装组件相互靠近的一端,用于对安装组件进行连接。本发明实现了本幕墙系统能够在各个楼层同步进行安装工作,无需起重设备逐一吊起幕墙单元,极大程度提高了幕墙单元的安装效率。
Large-span double-stand-column-unit curtain wall system and installation and construction method thereof
The invention discloses a large-span double-stand-column-unit curtain wall system and an installation and construction method thereof, and belongs to the technical field of curtain wall systems. The large-span double-stand-column-unit-body curtain wall system comprises two stand columns arranged in a spaced mode. Each installation assembly is correspondingly installed on one stand column and used for fixing the curtain wall unit; the two supporting assemblies are correspondingly connected between the two mounting assemblies and the two stand columns and used for supporting and positioning the mounting assemblies; and the connecting assemblies are correspondingly mounted at the ends, close to each other, of the two mounting assemblies and used for connecting the mounting assemblies. The curtain wall system can be synchronously installed on all floors, the curtain wall units do not need to be hoisted one by one through hoisting equipment, and the installation efficiency of the curtain wall units is greatly improved.
本发明公开了一种大跨度双立柱单元体幕墙系统及其安装施工方法,属于幕墙系统技术领域。本发明的大跨度双立柱单元体幕墙系统,包括:间隔设置的两个立柱;两个安装组件,每个安装组件分别对应安装于其中一个立柱上,并用于对幕墙单元进行固定;两个支撑组件,对应连接于两个安装组件与两个立柱之间,用于对安装组件进行支撑和定位;以及连接组件,对应安装于两个安装组件相互靠近的一端,用于对安装组件进行连接。本发明实现了本幕墙系统能够在各个楼层同步进行安装工作,无需起重设备逐一吊起幕墙单元,极大程度提高了幕墙单元的安装效率。
Large-span double-stand-column-unit curtain wall system and installation and construction method thereof
一种大跨度双立柱单元体幕墙系统及其安装施工方法
YE SHENGJUN (author) / LIU LIU (author) / QIAN YUANDI (author) / WU WEI (author)
2023-07-07
Patent
Electronic Resource
Chinese
Double-stand-column glass curtain wall construction method
European Patent Office | 2022
|European Patent Office | 2023
|Large-span curtain wall composite structure and installation method thereof
European Patent Office | 2021
|Double-support swing column system of large-span glass curtain wall
European Patent Office | 2024
|Large-span hanging type glass curtain wall installation method
European Patent Office | 2021
|