Construction method of hard road shoulder template for road construction
The invention provides a road construction hard shoulder template construction method, which relates to the technical field of road construction, and comprises the following steps: processing and manufacturing a template of a hard shoulder: adopting a bamboo template as the template; the formworks are installed on the two sides of the hard road shoulder to be poured. A fixed formwork used for supporting the formwork is manufactured; ground anchors are reserved on the two sides of the hard road shoulder, and the fixed formwork is fixed to the two sides of the hard road shoulder through the ground anchors and forms constraining force on the formwork. Concrete is poured into the formwork; removing the mold after the concrete is solidified and meets the requirement: firstly removing the fixed mold frame, and then removing the template; and the template can change along with the linear change of the road, so that the construction progress is accelerated, the construction becomes simple and quick, and the construction time is shortened.
本发明提供一种道路施工硬路肩模板施工方法,涉及道路施工技术领域,包括以下步骤:硬路肩的模板加工制作:模板采用竹木模板;模板安装在待浇筑硬路肩的两侧;制作用于对模板进行支撑的固定模架;在硬路肩的两侧预留地锚,固定模架通过地锚固定在硬路肩的两侧并对模板形成约束力;向模板浇筑混凝土;待混凝土凝固达到要求后拆模:先拆除固定模架,在拆除模板;模板能够随道路线形变化,模板随之发生变化,加快了施工进度,使施工变得简单快捷,缩短了施工时间。
Construction method of hard road shoulder template for road construction
The invention provides a road construction hard shoulder template construction method, which relates to the technical field of road construction, and comprises the following steps: processing and manufacturing a template of a hard shoulder: adopting a bamboo template as the template; the formworks are installed on the two sides of the hard road shoulder to be poured. A fixed formwork used for supporting the formwork is manufactured; ground anchors are reserved on the two sides of the hard road shoulder, and the fixed formwork is fixed to the two sides of the hard road shoulder through the ground anchors and forms constraining force on the formwork. Concrete is poured into the formwork; removing the mold after the concrete is solidified and meets the requirement: firstly removing the fixed mold frame, and then removing the template; and the template can change along with the linear change of the road, so that the construction progress is accelerated, the construction becomes simple and quick, and the construction time is shortened.
本发明提供一种道路施工硬路肩模板施工方法,涉及道路施工技术领域,包括以下步骤:硬路肩的模板加工制作:模板采用竹木模板;模板安装在待浇筑硬路肩的两侧;制作用于对模板进行支撑的固定模架;在硬路肩的两侧预留地锚,固定模架通过地锚固定在硬路肩的两侧并对模板形成约束力;向模板浇筑混凝土;待混凝土凝固达到要求后拆模:先拆除固定模架,在拆除模板;模板能够随道路线形变化,模板随之发生变化,加快了施工进度,使施工变得简单快捷,缩短了施工时间。
Construction method of hard road shoulder template for road construction
道路施工硬路肩模板施工方法
LI GONGHONG (author) / TANG QIN (author) / XUE JIAQUAN (author) / GUO YI (author) / HU YAOYI (author)
2023-07-11
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road shoulder retaining wall structure and construction method
European Patent Office | 2022
|Novel railway road shoulder structure and construction method