Preformed hole construction template
The invention relates to a construction forming auxiliary tool of a preformed hole in a construction site, in particular to a preformed hole construction formwork which comprises a rolling plate which is wound to form a cylindrical structure, the tail of the rolling plate is erected on the outer side of the front portion of the rolling plate, the front portion and the tail are overlapped, and an arc surface is formed on the surface of the outer side of the rolling plate. The construction formwork provided by the invention is arranged at the position of the preformed hole during concrete pouring, a cylindrical formwork structure can be kept in the concrete pouring process, and the construction formwork can be dismantled from the front part to the inside when the formwork dismantling condition is met, so that the construction convenience of the circular preformed hole is improved, and meanwhile, the formwork can be dismantled and reused; the repeated utilization rate is improved, and damage and waste of materials are avoided.
本发明涉及施工现场预留孔的施工成型辅助工具,具体涉及一种预留孔施工模板,一种预留孔施工模板,包括卷绕形成圆筒状结构的卷板,卷板的尾部搭设于卷板的前部外侧,前部与尾部重叠并使卷板的外侧表面形成圆弧面。本发明提供的施工模板,在进行混凝土浇筑时设置于预留孔的位置,在混凝土浇筑过程中可保持圆筒状的模板结构,并在达到拆模条件时可从前部向内进行拆除,如此提高了圆形预留孔的施工便捷度,同时可将模板拆除并进行再次利用,提高了重复利用率,也避免了造成材料的破坏和浪费。
Preformed hole construction template
The invention relates to a construction forming auxiliary tool of a preformed hole in a construction site, in particular to a preformed hole construction formwork which comprises a rolling plate which is wound to form a cylindrical structure, the tail of the rolling plate is erected on the outer side of the front portion of the rolling plate, the front portion and the tail are overlapped, and an arc surface is formed on the surface of the outer side of the rolling plate. The construction formwork provided by the invention is arranged at the position of the preformed hole during concrete pouring, a cylindrical formwork structure can be kept in the concrete pouring process, and the construction formwork can be dismantled from the front part to the inside when the formwork dismantling condition is met, so that the construction convenience of the circular preformed hole is improved, and meanwhile, the formwork can be dismantled and reused; the repeated utilization rate is improved, and damage and waste of materials are avoided.
本发明涉及施工现场预留孔的施工成型辅助工具,具体涉及一种预留孔施工模板,一种预留孔施工模板,包括卷绕形成圆筒状结构的卷板,卷板的尾部搭设于卷板的前部外侧,前部与尾部重叠并使卷板的外侧表面形成圆弧面。本发明提供的施工模板,在进行混凝土浇筑时设置于预留孔的位置,在混凝土浇筑过程中可保持圆筒状的模板结构,并在达到拆模条件时可从前部向内进行拆除,如此提高了圆形预留孔的施工便捷度,同时可将模板拆除并进行再次利用,提高了重复利用率,也避免了造成材料的破坏和浪费。
Preformed hole construction template
一种预留孔施工模板
LIU YIZHUO (author) / LONG JING (author) / XU LEI (author) / SON KANG-RAK (author) / WANG QINGHAI (author)
2023-07-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Preformed hole template for building civil engineering construction
European Patent Office | 2021