Synchronous construction method for external wall panel and main body structure
The invention discloses a synchronous construction method for an external wall panel and a main body structure. The method comprises the steps that S1, after a concrete floor of a reference layer is constructed, column steel bars of the reference layer are bound; s2, for the outer wall, without the reserved mounting hole, of the reference layer, a plurality of outer wall plates are arranged and stacked between every two adjacent column steel bars in a matrix mode, and the outer wall corresponding to the position between every two column steel bars is formed; for the outer wall of the reserved mounting hole of the reference layer, the outer wall panel is integrally formed and matched to form the mounting hole, and the outer wall panel is integrally hoisted and positioned to form the outer wall between two corresponding column steel bars; s3, formwork supporting is conducted on the main body structure and the outer wall of the reference layer, concrete is poured, and a formwork is removed after pouring is completed; and S4, taking the reference floor as a starting point, adding one floor every time, and repeating the steps S1-S3 until the end. The method has the beneficial effects that synchronous construction is achieved, installation is convenient, and meanwhile the overall connection strength is improved.
本发明公开了一种外墙板与主体结构同步施工方法,包括:S1、施工基准层的混凝土楼板后绑扎基准层的柱钢筋;S2、对于基准层的非预留安装洞的外墙,多个外墙板呈矩阵排列叠设于相邻两个柱钢筋间,构成对应两个柱钢筋间外墙;对于基准层的预留安装洞的外墙,外墙板一体成型,且配套形成安装洞,外墙板整体吊装定位,构成对应两个柱钢筋间外墙;S3、针对基准层的主体结构、外墙进行模板支撑,浇筑混凝土,浇筑完成后拆除模板;S4、以基准层楼层为起点,每次楼层增加1层重复步骤S1‑S3至结束。本发明具有同步施工、安装便利的同时增加整体连接强度的有益效果。
Synchronous construction method for external wall panel and main body structure
The invention discloses a synchronous construction method for an external wall panel and a main body structure. The method comprises the steps that S1, after a concrete floor of a reference layer is constructed, column steel bars of the reference layer are bound; s2, for the outer wall, without the reserved mounting hole, of the reference layer, a plurality of outer wall plates are arranged and stacked between every two adjacent column steel bars in a matrix mode, and the outer wall corresponding to the position between every two column steel bars is formed; for the outer wall of the reserved mounting hole of the reference layer, the outer wall panel is integrally formed and matched to form the mounting hole, and the outer wall panel is integrally hoisted and positioned to form the outer wall between two corresponding column steel bars; s3, formwork supporting is conducted on the main body structure and the outer wall of the reference layer, concrete is poured, and a formwork is removed after pouring is completed; and S4, taking the reference floor as a starting point, adding one floor every time, and repeating the steps S1-S3 until the end. The method has the beneficial effects that synchronous construction is achieved, installation is convenient, and meanwhile the overall connection strength is improved.
本发明公开了一种外墙板与主体结构同步施工方法,包括:S1、施工基准层的混凝土楼板后绑扎基准层的柱钢筋;S2、对于基准层的非预留安装洞的外墙,多个外墙板呈矩阵排列叠设于相邻两个柱钢筋间,构成对应两个柱钢筋间外墙;对于基准层的预留安装洞的外墙,外墙板一体成型,且配套形成安装洞,外墙板整体吊装定位,构成对应两个柱钢筋间外墙;S3、针对基准层的主体结构、外墙进行模板支撑,浇筑混凝土,浇筑完成后拆除模板;S4、以基准层楼层为起点,每次楼层增加1层重复步骤S1‑S3至结束。本发明具有同步施工、安装便利的同时增加整体连接强度的有益效果。
Synchronous construction method for external wall panel and main body structure
外墙板与主体结构同步施工方法
XUE SONG (author) / HAO TONGTU (author) / WANG YI (author)
2023-07-11
Patent
Electronic Resource
Chinese
Toilet prefabricated guide wall and main body structure synchronous construction method
European Patent Office | 2021
|Synchronous construction method for decorative batten and main body structure of outer wall
European Patent Office | 2023
|Synchronous construction method for wall and main body frame in steel structure building
European Patent Office | 2020
|Main body structure and waterstop synchronous construction method
European Patent Office | 2021
|Synchronous construction method of basement with underground continuous wall and main body
European Patent Office | 2015
|