A platform for research: civil engineering, architecture and urbanism
Overwater construction pile foundation mud treatment system and treatment method
The invention belongs to the field of bridge engineering construction, and particularly relates to an overwater construction pile foundation mud treatment system and method, the overwater construction pile foundation mud treatment system comprises a steel cofferdam formed by steel sheet piles, a filtering device is fixed on the inner side face of each steel sheet pile, and the filtering device comprises a fixing frame and filtering cotton; steel enclosing purlins are arranged in the steel sheet piles; a steel sleeve is arranged at the position of a pile foundation in the steel cofferdam in a driving mode. A new slurry treatment system is manufactured by utilizing the steel cofferdam which should be constructed, a slurry circulation system does not need to be additionally arranged, slurry transfer is not needed, slurry is filtered into the steel cofferdam, the slurry is prevented from flowing into a river, the pouring efficiency is improved, the cost is greatly saved, manpower and material resources are saved, and environmental pollution is avoided.
本发明属于桥梁工程施工领域,具体涉及到一种水上施工桩基泥浆处理体系及处理方法,包括钢板桩形成的钢围堰,在钢板桩内侧面上固定过滤装置,所述过滤装置包括固定框架和过滤棉;所述钢板桩内设有钢围檩;所述钢围堰内的桩基位置打设钢套筒。本发明利用本就应该施工的钢围堰制作了一种新的泥浆处理体系,无需另设泥浆循环系统,也无需泥浆的倒运,将泥浆过滤到钢围堰内,阻断了泥浆流入河流,提高了灌注效率,大幅度节约了成本,节省了人力物力,不会造成环境污染。
Overwater construction pile foundation mud treatment system and treatment method
The invention belongs to the field of bridge engineering construction, and particularly relates to an overwater construction pile foundation mud treatment system and method, the overwater construction pile foundation mud treatment system comprises a steel cofferdam formed by steel sheet piles, a filtering device is fixed on the inner side face of each steel sheet pile, and the filtering device comprises a fixing frame and filtering cotton; steel enclosing purlins are arranged in the steel sheet piles; a steel sleeve is arranged at the position of a pile foundation in the steel cofferdam in a driving mode. A new slurry treatment system is manufactured by utilizing the steel cofferdam which should be constructed, a slurry circulation system does not need to be additionally arranged, slurry transfer is not needed, slurry is filtered into the steel cofferdam, the slurry is prevented from flowing into a river, the pouring efficiency is improved, the cost is greatly saved, manpower and material resources are saved, and environmental pollution is avoided.
本发明属于桥梁工程施工领域,具体涉及到一种水上施工桩基泥浆处理体系及处理方法,包括钢板桩形成的钢围堰,在钢板桩内侧面上固定过滤装置,所述过滤装置包括固定框架和过滤棉;所述钢板桩内设有钢围檩;所述钢围堰内的桩基位置打设钢套筒。本发明利用本就应该施工的钢围堰制作了一种新的泥浆处理体系,无需另设泥浆循环系统,也无需泥浆的倒运,将泥浆过滤到钢围堰内,阻断了泥浆流入河流,提高了灌注效率,大幅度节约了成本,节省了人力物力,不会造成环境污染。
Overwater construction pile foundation mud treatment system and treatment method
一种水上施工桩基泥浆处理体系及处理方法
BI QINGJIE (author) / LI YONGLI (author) / SONG MINGYU (author) / YIN YICHAO (author) / LIU XU (author) / YANG JIE (author) / YANG SHUAI (author) / DOU LICHAO (author) / DENG BAITAO (author)
2023-07-14
Patent
Electronic Resource
Chinese
Overwater multi-platform pile foundation construction method
European Patent Office | 2024
|Overwater construction method for photovoltaic support foundation pile
European Patent Office | 2024
|Overwater construction method of photovoltaic support foundation pile
European Patent Office | 2023
|Overwater pile cap, construction system and construction method
European Patent Office | 2024
|