A platform for research: civil engineering, architecture and urbanism
Damping shock absorption assembly type prefabricated shear wall
The invention provides a damping assembly type prefabricated shear wall which comprises a damping assembly, and the damping assembly comprises a cross beam, a damping box, a connecting box, a first wall body, a second wall body, a concentric-square-shaped plate, a positioning rod, a moving block, a first spring, a hinge rod, a connecting plate, an inclined rod, a moving rod, a fixed rod and a second spring. The top of the cross beam is fixedly connected with a damping box with an opening in the top. The first wall body and the second wall body drive a connecting box to move downwards, the connecting box drives a connecting plate to move through an inclined rod, the connecting plate drives a moving rod to slide on a fixed rod and compress or stretch a second spring, a buffering effect is achieved under the action of the self elasticity of the second spring, primary buffering is achieved, and the buffering effect is good. The connecting plate drives the moving block to slide on the positioning rod through the hinge rod and compresses or stretches the first spring, secondary buffering is carried out under the action of the elastic force of the first spring, and therefore multi-stage buffering is carried out, and the service life of the device is prolonged.
本发明提供了一种阻尼减震装配式预制剪力墙,包括减震组件,所述减震组件包括横梁、减震箱、连接箱、第一墙体、第二墙体、回形板、定位杆、移动块、第一弹簧、铰接杆、连接板、倾斜杆、移动杆、固定杆、第二弹簧;所述横梁的顶部固定连接有顶部为开口设置的减震箱。本发明第一墙体和第二墙体带动连接箱向下移动,连接箱通过倾斜杆带动连接板移动,连接板带动移动杆在固定杆上滑并对第二弹簧进行压缩或拉伸,在第二弹簧自身弹力的作用下起到了缓冲的作用,进行一级缓冲,连接板通过铰接杆带动移动块在定位杆上滑动并对第一弹簧进行压缩或拉伸,通过第一弹簧自身弹力的作用下进行二级缓冲,从而进行多级缓冲,提高其使用寿命。
Damping shock absorption assembly type prefabricated shear wall
The invention provides a damping assembly type prefabricated shear wall which comprises a damping assembly, and the damping assembly comprises a cross beam, a damping box, a connecting box, a first wall body, a second wall body, a concentric-square-shaped plate, a positioning rod, a moving block, a first spring, a hinge rod, a connecting plate, an inclined rod, a moving rod, a fixed rod and a second spring. The top of the cross beam is fixedly connected with a damping box with an opening in the top. The first wall body and the second wall body drive a connecting box to move downwards, the connecting box drives a connecting plate to move through an inclined rod, the connecting plate drives a moving rod to slide on a fixed rod and compress or stretch a second spring, a buffering effect is achieved under the action of the self elasticity of the second spring, primary buffering is achieved, and the buffering effect is good. The connecting plate drives the moving block to slide on the positioning rod through the hinge rod and compresses or stretches the first spring, secondary buffering is carried out under the action of the elastic force of the first spring, and therefore multi-stage buffering is carried out, and the service life of the device is prolonged.
本发明提供了一种阻尼减震装配式预制剪力墙,包括减震组件,所述减震组件包括横梁、减震箱、连接箱、第一墙体、第二墙体、回形板、定位杆、移动块、第一弹簧、铰接杆、连接板、倾斜杆、移动杆、固定杆、第二弹簧;所述横梁的顶部固定连接有顶部为开口设置的减震箱。本发明第一墙体和第二墙体带动连接箱向下移动,连接箱通过倾斜杆带动连接板移动,连接板带动移动杆在固定杆上滑并对第二弹簧进行压缩或拉伸,在第二弹簧自身弹力的作用下起到了缓冲的作用,进行一级缓冲,连接板通过铰接杆带动移动块在定位杆上滑动并对第一弹簧进行压缩或拉伸,通过第一弹簧自身弹力的作用下进行二级缓冲,从而进行多级缓冲,提高其使用寿命。
Damping shock absorption assembly type prefabricated shear wall
一种阻尼减震装配式预制剪力墙
LI SHUFENG (author) / LUO CHUNYANG (author) / LIU HONGXIN (author) / LING SHENGYUAN (author) / ZHANG SHUAI (author) / DU WEI (author) / QIN XUNA (author)
2023-07-14
Patent
Electronic Resource
Chinese
Damping shock absorption assembly type connecting joint for prefabricated shear wall
European Patent Office | 2023
|Damping shock absorption fabricated connecting device of prefabricated shear wall
European Patent Office | 2021
|Assembly type prefabricated combined shear wall component
European Patent Office | 2020
|Prefabricated combined assembly type steel plate shear wall
European Patent Office | 2021
|