A platform for research: civil engineering, architecture and urbanism
Conjoined structure lifting construction tower resetting device and construction method
The invention discloses a reset device for a lifting construction tower of a connected structure and a construction method, the reset device for the tower comprises supports at two ends, the support at one end is connected with a jack, the support at the other end is connected with a spherical hinge support, and the jack is connected with the spherical hinge support. According to the construction technology for lifting the connected structure, the tower resetting device is arranged, tower deformation caused by lifting construction can be effectively reduced, and the safety and reliability of the structure are improved; the tower resetting device is clear in force transmission, simple to manufacture and convenient to construct; h-shaped section steel, box-shaped section steel and the like can be adopted for the force transmission support according to construction site conditions, special manufacturing is not needed, and economy and convenience are achieved; when the tower structure deforms greatly in the horizontal direction, the butt joint steel beam deforms to a certain extent in the vertical direction, one side of the force transmission support adopts a spherical hinge form, and the tower structure is still applicable under the condition and has great construction feasibility.
本发明公开了一种连体结构提升施工塔楼复位装置及施工方法,塔楼复位装置,包括两端的支座,一端所述支座连接有千斤顶,另一端所述支座连接有球铰支座,所述千斤顶与所述球铰支座连接。本发明针对于连体结构提升的施工工艺,设置塔楼复位装置,可以有效减小由于提升施工引起的塔楼变形,提高结构的安全性与可靠性;塔楼复位装置传力明确,制造简单,施工便利;传力支撑可根据施工现场条件,采用H型截面、箱型截面钢等,无需特别制作,经济便利;当塔楼结构水平向变形较大时,其在对接钢梁在竖向也存在一定变形,本发明的传力支撑一侧采用球铰的形式,在这种情况下仍然适用,且具有较大的施工可行性。
Conjoined structure lifting construction tower resetting device and construction method
The invention discloses a reset device for a lifting construction tower of a connected structure and a construction method, the reset device for the tower comprises supports at two ends, the support at one end is connected with a jack, the support at the other end is connected with a spherical hinge support, and the jack is connected with the spherical hinge support. According to the construction technology for lifting the connected structure, the tower resetting device is arranged, tower deformation caused by lifting construction can be effectively reduced, and the safety and reliability of the structure are improved; the tower resetting device is clear in force transmission, simple to manufacture and convenient to construct; h-shaped section steel, box-shaped section steel and the like can be adopted for the force transmission support according to construction site conditions, special manufacturing is not needed, and economy and convenience are achieved; when the tower structure deforms greatly in the horizontal direction, the butt joint steel beam deforms to a certain extent in the vertical direction, one side of the force transmission support adopts a spherical hinge form, and the tower structure is still applicable under the condition and has great construction feasibility.
本发明公开了一种连体结构提升施工塔楼复位装置及施工方法,塔楼复位装置,包括两端的支座,一端所述支座连接有千斤顶,另一端所述支座连接有球铰支座,所述千斤顶与所述球铰支座连接。本发明针对于连体结构提升的施工工艺,设置塔楼复位装置,可以有效减小由于提升施工引起的塔楼变形,提高结构的安全性与可靠性;塔楼复位装置传力明确,制造简单,施工便利;传力支撑可根据施工现场条件,采用H型截面、箱型截面钢等,无需特别制作,经济便利;当塔楼结构水平向变形较大时,其在对接钢梁在竖向也存在一定变形,本发明的传力支撑一侧采用球铰的形式,在这种情况下仍然适用,且具有较大的施工可行性。
Conjoined structure lifting construction tower resetting device and construction method
一种连体结构提升施工塔楼复位装置及施工方法
YE DONGCHEN (author) / JIA SHANGRUI (author) / ZHANG ZHIHAO (author) / XING ZUNSHENG (author) / WU CHUQIAO (author) / XU CHANGSEN (author) / WU DI (author) / DING LI (author)
2023-07-14
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of conjoined structure conversion platform
European Patent Office | 2023
|Collaborative conjoined pile foundation construction device and construction process
European Patent Office | 2020
|Lifting construction method of steel structure cooling tower
European Patent Office | 2024
|Main tower top lifting system and main tower top lifting construction method
European Patent Office | 2023
|