A platform for research: civil engineering, architecture and urbanism
Elevator foundation structure and construction method thereof
The invention relates to the technical field of elevators, and discloses an elevator foundation structure and a construction method thereof. The elevator foundation structure comprises a foundation pit formed in the ground and used for determining the installation position of an elevator; the base is fixedly mounted in the foundation pit; and the foundation pillar is fixedly mounted in the base. The anchor rods and the supporting columns are additionally arranged on the foundation structure so that the gravity of the whole elevator can be better borne, in the construction method, concrete of the foundation columns makes contact with the anchor rods when not cooled, the anchor rods and the foundation columns are difficult to separate after cooling, then the foundation columns are fixed to the current position through the bases, and the foundation columns are fixed to the current position. Therefore, the elevator can still work stably in windy weather; and on the other hand, the pressed fixing points and the pulled fixing points are separated, so that the service life of the fixing points is guaranteed.
本发明涉及电梯技术领域,公开了一种电梯基础结构及其施工方法。所述电梯基础结构包括:基坑,开设于地面,用于确定电梯的安装位置;基座,固定安装在所述基坑内部;基柱,固定安装在所述基座的内部。本发明通过在该基础结构上增设锚杆和支撑柱以更好地承担整个电梯的重力,在施工方法中,在基柱的混凝土未冷却时便已和锚杆相接触,使得冷却后锚杆和基柱之间难以分离,再通过基座将基柱固定在当前位置,从而保证该电梯在大风天气依旧能够工作稳定;另一方面将受压和受拉的固定点分开,以此保证固定点处的使用寿命。
Elevator foundation structure and construction method thereof
The invention relates to the technical field of elevators, and discloses an elevator foundation structure and a construction method thereof. The elevator foundation structure comprises a foundation pit formed in the ground and used for determining the installation position of an elevator; the base is fixedly mounted in the foundation pit; and the foundation pillar is fixedly mounted in the base. The anchor rods and the supporting columns are additionally arranged on the foundation structure so that the gravity of the whole elevator can be better borne, in the construction method, concrete of the foundation columns makes contact with the anchor rods when not cooled, the anchor rods and the foundation columns are difficult to separate after cooling, then the foundation columns are fixed to the current position through the bases, and the foundation columns are fixed to the current position. Therefore, the elevator can still work stably in windy weather; and on the other hand, the pressed fixing points and the pulled fixing points are separated, so that the service life of the fixing points is guaranteed.
本发明涉及电梯技术领域,公开了一种电梯基础结构及其施工方法。所述电梯基础结构包括:基坑,开设于地面,用于确定电梯的安装位置;基座,固定安装在所述基坑内部;基柱,固定安装在所述基座的内部。本发明通过在该基础结构上增设锚杆和支撑柱以更好地承担整个电梯的重力,在施工方法中,在基柱的混凝土未冷却时便已和锚杆相接触,使得冷却后锚杆和基柱之间难以分离,再通过基座将基柱固定在当前位置,从而保证该电梯在大风天气依旧能够工作稳定;另一方面将受压和受拉的固定点分开,以此保证固定点处的使用寿命。
Elevator foundation structure and construction method thereof
一种电梯基础结构及其施工方法
ZHOU MAOHUI (author) / YANG TAO (author) / ZHONG JIA (author) / SU GUANGHONG (author) / WANG XUEJUN (author) / ZHU HUAN (author)
2023-07-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Elevator foundation pit structure and elevator foundation pit construction method
European Patent Office | 2024
|Construction method of sunken construction elevator foundation structure
European Patent Office | 2022
|Single-foundation construction elevator foundation and construction method
European Patent Office | 2024
|European Patent Office | 2023
|