A platform for research: civil engineering, architecture and urbanism
Road curbstone structure and construction method
The invention relates to a road curbstone structure and a construction method, and relates to the technical field of road construction, the road curbstone structure comprises an embedded steel bar group, a curbstone base, a standing stone, a gutter apron, a leaning stone, a first fixing assembly, a second fixing assembly and a third fixing assembly; wherein the embedded steel bar group is embedded in a foundation, the curbstone base is positioned on the foundation through the embedded steel bar group, the gutter apron and the leaning stone are also positioned on the curbstone base through the embedded steel bar group, the first fixing assembly is arranged on the curbstone base and used for fixing the standing stone between the gutter apron and the leaning stone, and the second fixing assembly is arranged on the side, close to the gutter apron, of the standing stone and used for fixing the standing stone between the gutter apron and the leaning stone. The third fixing assembly is arranged on the side, close to the leaning stone, of the standing stone and used for fixing the standing stone and the leaning stone in a matched mode. The stability of mounting the curbstone can be improved through the first fixing assembly, the second fixing assembly and the third fixing assembly, so that the overall strength of the curbstone is improved.
本申请涉及一种道路侧石结构及施工方法,涉及道路施工的技术领域,其包括预埋钢筋组、侧石底座、立石、平石、靠石、第一固定组件、第二固定组件和第三固定组件;其中,预埋钢筋组预埋在地基内,侧石底座通过预埋钢筋组定位在地基上,平石和靠石也通过预埋钢筋组定位在侧石底座上,第一固定组件设置在侧石底座上,用于将立石固定在平石和靠石之间,第二固定组件设置在立石靠近平石的一侧,用于将立石和平石配合固定,第三固定组件设置在立石靠近靠石的一侧,用于将立石和靠石配合固定。本申请能够通过第一固定组件、第二固定组件和第三固定组件提高安装侧石的稳定性,从而提高侧石的整体强度。
Road curbstone structure and construction method
The invention relates to a road curbstone structure and a construction method, and relates to the technical field of road construction, the road curbstone structure comprises an embedded steel bar group, a curbstone base, a standing stone, a gutter apron, a leaning stone, a first fixing assembly, a second fixing assembly and a third fixing assembly; wherein the embedded steel bar group is embedded in a foundation, the curbstone base is positioned on the foundation through the embedded steel bar group, the gutter apron and the leaning stone are also positioned on the curbstone base through the embedded steel bar group, the first fixing assembly is arranged on the curbstone base and used for fixing the standing stone between the gutter apron and the leaning stone, and the second fixing assembly is arranged on the side, close to the gutter apron, of the standing stone and used for fixing the standing stone between the gutter apron and the leaning stone. The third fixing assembly is arranged on the side, close to the leaning stone, of the standing stone and used for fixing the standing stone and the leaning stone in a matched mode. The stability of mounting the curbstone can be improved through the first fixing assembly, the second fixing assembly and the third fixing assembly, so that the overall strength of the curbstone is improved.
本申请涉及一种道路侧石结构及施工方法,涉及道路施工的技术领域,其包括预埋钢筋组、侧石底座、立石、平石、靠石、第一固定组件、第二固定组件和第三固定组件;其中,预埋钢筋组预埋在地基内,侧石底座通过预埋钢筋组定位在地基上,平石和靠石也通过预埋钢筋组定位在侧石底座上,第一固定组件设置在侧石底座上,用于将立石固定在平石和靠石之间,第二固定组件设置在立石靠近平石的一侧,用于将立石和平石配合固定,第三固定组件设置在立石靠近靠石的一侧,用于将立石和靠石配合固定。本申请能够通过第一固定组件、第二固定组件和第三固定组件提高安装侧石的稳定性,从而提高侧石的整体强度。
Road curbstone structure and construction method
一种道路侧石结构及施工方法
YING HAIZENG (author) / GUO ZHAOGUI (author) / QIU BINGSHU (author) / WANG JIANCHENG (author) / WEI WENBO (author)
2023-07-21
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road curbstone construction method and road curbstone structure
European Patent Office | 2023
|Double-wheel lever pliers for road curbstone installation and road curbstone installation method
European Patent Office | 2021
|