A platform for research: civil engineering, architecture and urbanism
Fabricated reinforced concrete beam-column joint and construction method thereof
The invention belongs to the technical field of building construction, and relates to a fabricated reinforced concrete beam-column joint and a construction method thereof.The two second prefabricated frame beams and the two first prefabricated frame beams are symmetrically arranged and located above a frame column, and a plurality of column longitudinal steel bars are arranged at the top of the frame column; the multiple column longitudinal steel bars are located at the four corners of the frame column correspondingly, and installation assemblies used for installation are arranged between the first prefabricated frame beam and the frame column and between the second prefabricated frame beam and the frame column correspondingly. The ends, close to each other, of the first prefabricated frame beam and the second prefabricated frame beam are each provided with a connecting assembly used for connecting the first prefabricated frame beam and the second prefabricated frame beam. Four first mounting grooves are formed in the top of the frame column, and fixing assemblies used for fixing the steel corbels are arranged in the first mounting grooves; the problems that when an existing frame column and a prefabricated frame beam are installed, only steel corbels and bolts are used for connecting the steel corbels and the frame column, only bolt connection is used, and connection is not stable enough are solved.
本发明属于建筑施工技术领域,涉及到一种装配式钢筋混凝土梁柱节点及其施工方法,两个第二预制框架梁和两个第一预制框架梁分别呈对称设置并均位于框架柱的上方,框架柱的顶部设置有多个柱纵向钢筋,多个柱纵向钢筋分别位于框架柱的四角,第一预制框架梁和第二预制框架梁与框架柱之间均设置有用于安装的安装组件;第一预制框架梁和第二预制框架梁相互靠近的一端均设置有用于连接第一预制框架梁和第二预制框架梁的连接组件;框架柱的顶部开设有四个第一安装槽,第一安装槽的内部设置有用于固定钢牛腿的固定组件;解决现有的框架柱与预制框架梁安装时,仅仅依靠钢牛腿和螺栓钢牛腿在与框架柱进行连接时,仅仅通过螺栓连接,连接不够稳固的问题。
Fabricated reinforced concrete beam-column joint and construction method thereof
The invention belongs to the technical field of building construction, and relates to a fabricated reinforced concrete beam-column joint and a construction method thereof.The two second prefabricated frame beams and the two first prefabricated frame beams are symmetrically arranged and located above a frame column, and a plurality of column longitudinal steel bars are arranged at the top of the frame column; the multiple column longitudinal steel bars are located at the four corners of the frame column correspondingly, and installation assemblies used for installation are arranged between the first prefabricated frame beam and the frame column and between the second prefabricated frame beam and the frame column correspondingly. The ends, close to each other, of the first prefabricated frame beam and the second prefabricated frame beam are each provided with a connecting assembly used for connecting the first prefabricated frame beam and the second prefabricated frame beam. Four first mounting grooves are formed in the top of the frame column, and fixing assemblies used for fixing the steel corbels are arranged in the first mounting grooves; the problems that when an existing frame column and a prefabricated frame beam are installed, only steel corbels and bolts are used for connecting the steel corbels and the frame column, only bolt connection is used, and connection is not stable enough are solved.
本发明属于建筑施工技术领域,涉及到一种装配式钢筋混凝土梁柱节点及其施工方法,两个第二预制框架梁和两个第一预制框架梁分别呈对称设置并均位于框架柱的上方,框架柱的顶部设置有多个柱纵向钢筋,多个柱纵向钢筋分别位于框架柱的四角,第一预制框架梁和第二预制框架梁与框架柱之间均设置有用于安装的安装组件;第一预制框架梁和第二预制框架梁相互靠近的一端均设置有用于连接第一预制框架梁和第二预制框架梁的连接组件;框架柱的顶部开设有四个第一安装槽,第一安装槽的内部设置有用于固定钢牛腿的固定组件;解决现有的框架柱与预制框架梁安装时,仅仅依靠钢牛腿和螺栓钢牛腿在与框架柱进行连接时,仅仅通过螺栓连接,连接不够稳固的问题。
Fabricated reinforced concrete beam-column joint and construction method thereof
一种装配式钢筋混凝土梁柱节点及其施工方法
WANG XIAOLIN (author) / MA YUEYANG (author) / LI ZI'ANG (author) / YANG XU (author) / ZHANG MING (author) / MIAO FENG (author) / LIU TIANAN (author) / WANG WEI (author) / ZHAO QIANG (author)
2023-07-21
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated reinforced concrete beam-column connecting joint and construction method thereof
European Patent Office | 2023
|Fabricated reinforced concrete beam-column connecting joint and construction method
European Patent Office | 2023
|