A platform for research: civil engineering, architecture and urbanism
Anti-seepage and anti-impact flood bank for water conservancy project
The invention provides an anti-seepage and anti-impact flood bank for a water conservancy project, and relates to the technical field of flood banks. The anti-seepage and anti-impact flood bank for the water conservancy project comprises a protection bank body, a sidewalk is arranged on one side of the upper end of the protection bank body, guardrails are fixedly arranged on the two sides of the upper end of the sidewalk, and a plurality of planting grooves are formed in the side, away from the sidewalk, of the upper end of the protection bank body; a partition plate is fixedly arranged at the position, close to the upper end, of one side in the protective embankment body, a storage battery and a controller are fixedly arranged at the upper end of the partition plate, a concrete block is fixedly arranged on one side of the lower end in the protective embankment body, a supporting layer is fixedly arranged on one side of the concrete block, and a plurality of sensors are fixedly arranged on one side of the supporting layer. And through the first waterproof plate and the second waterproof plate which are arranged inside, the impermeability is improved, the situation that the waterproof plates are loosened after the flood bank is installed for a long time can be avoided, and the anti-impact and anti-seepage capacity of the flood bank is improved.
本发明提供一种水利工程用抗渗防冲击防洪堤,涉及防洪堤技术领域。该水利工程用抗渗防冲击防洪堤,包括防护堤本体,所述防护堤本体上端一侧设置有人行道,所述人行道上端两侧均固定设置有护栏,所述防护堤本体上端远离人行道一侧开设有多个种植槽,所述防护堤本体内部一侧靠上端固定设置有隔板,所述隔板上端固定设置有蓄电池和控制器,所述防护堤本体内部下端一侧固定设置有混凝土块,所述混凝土块一侧固定设置有支撑层,所述支撑层一侧固定设置有多个传感器。通过内部设置的第一防水板与第二防水板提高了防渗性,并且可避免本防洪堤安装时间过长后防水板松懈,提高了本防洪堤防冲击与防渗的能力。
Anti-seepage and anti-impact flood bank for water conservancy project
The invention provides an anti-seepage and anti-impact flood bank for a water conservancy project, and relates to the technical field of flood banks. The anti-seepage and anti-impact flood bank for the water conservancy project comprises a protection bank body, a sidewalk is arranged on one side of the upper end of the protection bank body, guardrails are fixedly arranged on the two sides of the upper end of the sidewalk, and a plurality of planting grooves are formed in the side, away from the sidewalk, of the upper end of the protection bank body; a partition plate is fixedly arranged at the position, close to the upper end, of one side in the protective embankment body, a storage battery and a controller are fixedly arranged at the upper end of the partition plate, a concrete block is fixedly arranged on one side of the lower end in the protective embankment body, a supporting layer is fixedly arranged on one side of the concrete block, and a plurality of sensors are fixedly arranged on one side of the supporting layer. And through the first waterproof plate and the second waterproof plate which are arranged inside, the impermeability is improved, the situation that the waterproof plates are loosened after the flood bank is installed for a long time can be avoided, and the anti-impact and anti-seepage capacity of the flood bank is improved.
本发明提供一种水利工程用抗渗防冲击防洪堤,涉及防洪堤技术领域。该水利工程用抗渗防冲击防洪堤,包括防护堤本体,所述防护堤本体上端一侧设置有人行道,所述人行道上端两侧均固定设置有护栏,所述防护堤本体上端远离人行道一侧开设有多个种植槽,所述防护堤本体内部一侧靠上端固定设置有隔板,所述隔板上端固定设置有蓄电池和控制器,所述防护堤本体内部下端一侧固定设置有混凝土块,所述混凝土块一侧固定设置有支撑层,所述支撑层一侧固定设置有多个传感器。通过内部设置的第一防水板与第二防水板提高了防渗性,并且可避免本防洪堤安装时间过长后防水板松懈,提高了本防洪堤防冲击与防渗的能力。
Anti-seepage and anti-impact flood bank for water conservancy project
一种水利工程用抗渗防冲击防洪堤
REN XIAODONG (author) / DU SHAN (author)
2023-07-28
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Water conservancy project flood discharge anti-seepage dam
European Patent Office | 2020
|Anti-seepage protection slope for water conservancy flood control
European Patent Office | 2024
|