The invention relates to a construction method of an assembly type building laminated slab, which belongs to the technical field of building construction, and comprises the following steps: S1, surveying personnel performs paying-off according to a construction drawing, and determines the position of each supporting point of the laminated slab; s2, a supporting structure is installed according to the position of the supporting point, the supporting structure comprises a tripod, a main rod and an extension rod, the tripod is installed at the position of the supporting point obtained through surveying and setting out, one end of the main rod is fixedly connected with the tripod, and an extension plate is slidably connected with the main rod; s3, a lifting hook of a crane is used for being connected with the laminated slab, the laminated slab is hoisted, and the laminated slab is hoisted to the position above the supporting structure; and S4, electromechanical pipelines are laid according to design requirements, and concrete pouring is conducted on the laminated slab. The device has the effect of adjusting the height of the supporting system.
本申请涉及一种装配式建筑叠合板的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1、测量人员根据施工图纸进行放线,确定叠合板每个支撑点的位置;S2、根据支撑点的位置安装支撑结构,支撑结构包括三角架、主杆以及延长杆,三角架安装在测量放线所得支撑点的位置处,主杆一端和三角架固定连接,延长板和主杆滑动连接;S3、使用吊车的吊钩和叠合板连接,对叠合板进行吊装,将叠合板吊运至支撑结构上方;S4、根据设计要求进行机电管线的铺设,对叠合板进行混凝土浇筑。本申请具有调节支撑体系高度的效果。
Construction method of fabricated building laminated slab
The invention relates to a construction method of an assembly type building laminated slab, which belongs to the technical field of building construction, and comprises the following steps: S1, surveying personnel performs paying-off according to a construction drawing, and determines the position of each supporting point of the laminated slab; s2, a supporting structure is installed according to the position of the supporting point, the supporting structure comprises a tripod, a main rod and an extension rod, the tripod is installed at the position of the supporting point obtained through surveying and setting out, one end of the main rod is fixedly connected with the tripod, and an extension plate is slidably connected with the main rod; s3, a lifting hook of a crane is used for being connected with the laminated slab, the laminated slab is hoisted, and the laminated slab is hoisted to the position above the supporting structure; and S4, electromechanical pipelines are laid according to design requirements, and concrete pouring is conducted on the laminated slab. The device has the effect of adjusting the height of the supporting system.
本申请涉及一种装配式建筑叠合板的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1、测量人员根据施工图纸进行放线,确定叠合板每个支撑点的位置;S2、根据支撑点的位置安装支撑结构,支撑结构包括三角架、主杆以及延长杆,三角架安装在测量放线所得支撑点的位置处,主杆一端和三角架固定连接,延长板和主杆滑动连接;S3、使用吊车的吊钩和叠合板连接,对叠合板进行吊装,将叠合板吊运至支撑结构上方;S4、根据设计要求进行机电管线的铺设,对叠合板进行混凝土浇筑。本申请具有调节支撑体系高度的效果。
Construction method of fabricated building laminated slab
一种装配式建筑叠合板的施工方法
LIU QIANG (author) / QI YANGYANG (author) / ZHAO QIANG (author) / MA YUNLONG (author) / GAO WEITAO (author) / XING YAOQIANG (author) / QU JIAPENG (author) / LI QI (author) / XU HOUCAI (author) / LIU XUEMEI (author)
2023-07-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Laminated slab for fabricated building and construction method
European Patent Office | 2022
|Fabricated building modular laminated slab and construction method
European Patent Office | 2022
|Fabricated building laminated slab construction equipment and method
European Patent Office | 2023
|Fabricated building construction method and laminated slab construction supporting system
European Patent Office | 2021
|Construction method of prefabricated laminated slab for fabricated building
European Patent Office | 2023
|