Waterproof construction method for basement outer wall
The invention discloses a waterproof construction method for a basement outer wall. The construction method comprises the steps of a, preparation before construction; b, brushing of a base layer treating agent; c, laying a coiled material waterproof layer; d, mounting the lightweight aggregate waterproof protection wallboard; and e, construction is completed. The coiled material waterproof layer is laid and pasted through the coiled material laying device, the waterproof effect of the coiled material waterproof layer on the basement exterior wall is greatly improved, meanwhile, manpower needed when the coiled material waterproof layer is laid is reduced, the laying precision of the coiled material waterproof layer is improved, after the coiled material waterproof layer is laid, a reserved turned edge is turned upwards, and the coiled material waterproof layer is not prone to falling off. And the light aggregate waterproof protection wall plate is fixed to the outer side of the coiled material waterproof layer, so that the waterproof effect of the basement outer wall is improved, and the coiled material waterproof layer is protected.
本发明公开了地下室外墙防水施工方,施工方法包括:a、施工前准备;b、基层处理剂的涂刷;c、卷材防水层铺设;d、轻集料防水保护墙板的安装;e、完成施工。本发明通过卷材铺设装置对卷材防水层进行铺设粘贴,大大提高了卷材防水层对地下室外墙的防水效果,同时减少了卷材防水层铺设时所需的人力,且提高了卷材防水层铺设精度,卷材防水层铺设完成后,将预留的翻边向上翻折,从而增加防水效果,并在卷材防水层的外侧固定轻集料防水保护墙板,不仅增加了地下室外墙的防水效果,还对卷材防水层起到一个保护作用。
Waterproof construction method for basement outer wall
The invention discloses a waterproof construction method for a basement outer wall. The construction method comprises the steps of a, preparation before construction; b, brushing of a base layer treating agent; c, laying a coiled material waterproof layer; d, mounting the lightweight aggregate waterproof protection wallboard; and e, construction is completed. The coiled material waterproof layer is laid and pasted through the coiled material laying device, the waterproof effect of the coiled material waterproof layer on the basement exterior wall is greatly improved, meanwhile, manpower needed when the coiled material waterproof layer is laid is reduced, the laying precision of the coiled material waterproof layer is improved, after the coiled material waterproof layer is laid, a reserved turned edge is turned upwards, and the coiled material waterproof layer is not prone to falling off. And the light aggregate waterproof protection wall plate is fixed to the outer side of the coiled material waterproof layer, so that the waterproof effect of the basement outer wall is improved, and the coiled material waterproof layer is protected.
本发明公开了地下室外墙防水施工方,施工方法包括:a、施工前准备;b、基层处理剂的涂刷;c、卷材防水层铺设;d、轻集料防水保护墙板的安装;e、完成施工。本发明通过卷材铺设装置对卷材防水层进行铺设粘贴,大大提高了卷材防水层对地下室外墙的防水效果,同时减少了卷材防水层铺设时所需的人力,且提高了卷材防水层铺设精度,卷材防水层铺设完成后,将预留的翻边向上翻折,从而增加防水效果,并在卷材防水层的外侧固定轻集料防水保护墙板,不仅增加了地下室外墙的防水效果,还对卷材防水层起到一个保护作用。
Waterproof construction method for basement outer wall
地下室外墙防水施工方法
LU SHIWEI (author) / TAO DIANKUI (author) / ZHANG XU (author) / ZHAO GUANGSHAN (author) / ZOU XUN (author) / ZHOU JIESHENG (author)
2023-08-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement outer wall multi-layer waterproof construction method
European Patent Office | 2024
|Basement outer wall construction joint waterproof structure and construction method
European Patent Office | 2024
|Basement outer wall waterproof structure and construction method thereof
European Patent Office | 2022
|Basement outer wall overhanging beam waterproof structure and construction method
European Patent Office | 2024
|