A platform for research: civil engineering, architecture and urbanism
Fixing method of concrete formwork
The invention relates to a fixing method for a concrete formwork. The fixing method comprises the following steps that a panel of a to-be-poured part is erected on a poured part of a pouring object; a vertical keel and a transverse keel which are mutually orthogonally arranged are erected on the outer surface of the panel; a first opposite-pull rod is arranged at the upper end of each vertical keel and is fixed with the vertical keel on the opposite side; a second opposite-pull rod is arranged at the lower end of the vertical keel and fixed to a sleeve embedded in the poured part; second opposite-pull rods are arranged at the two ends of the transverse keel and fixed to sleeves pre-buried in the poured part; and the sleeve is positioned through the panel when the poured part is poured. According to the method, the conditions of formwork loosening and leakage can be avoided.
本发明涉及一种混凝土模板的固定方法,包括以下步骤:在浇筑物的已浇筑部分架设待浇筑部分的面板;在所述面板的外表面架设包括相互正交布设的竖向龙骨和横向龙骨;在所述竖向龙骨的上端设置第一对拉杆与对侧的竖向龙骨固定;在所述竖向龙骨的下端设置第二对拉杆与已浇筑部分内预埋的套筒固定;在所述横向龙骨的两端设置第二对拉杆与已浇筑部分内预埋的套筒固定;所述套筒通过已浇筑部分浇筑时的面板进行定位。本申请的方法能避免模板松脱、出现渗漏的状况。
Fixing method of concrete formwork
The invention relates to a fixing method for a concrete formwork. The fixing method comprises the following steps that a panel of a to-be-poured part is erected on a poured part of a pouring object; a vertical keel and a transverse keel which are mutually orthogonally arranged are erected on the outer surface of the panel; a first opposite-pull rod is arranged at the upper end of each vertical keel and is fixed with the vertical keel on the opposite side; a second opposite-pull rod is arranged at the lower end of the vertical keel and fixed to a sleeve embedded in the poured part; second opposite-pull rods are arranged at the two ends of the transverse keel and fixed to sleeves pre-buried in the poured part; and the sleeve is positioned through the panel when the poured part is poured. According to the method, the conditions of formwork loosening and leakage can be avoided.
本发明涉及一种混凝土模板的固定方法,包括以下步骤:在浇筑物的已浇筑部分架设待浇筑部分的面板;在所述面板的外表面架设包括相互正交布设的竖向龙骨和横向龙骨;在所述竖向龙骨的上端设置第一对拉杆与对侧的竖向龙骨固定;在所述竖向龙骨的下端设置第二对拉杆与已浇筑部分内预埋的套筒固定;在所述横向龙骨的两端设置第二对拉杆与已浇筑部分内预埋的套筒固定;所述套筒通过已浇筑部分浇筑时的面板进行定位。本申请的方法能避免模板松脱、出现渗漏的状况。
Fixing method of concrete formwork
混凝土模板的固定方法
WU JIAN (author) / YUAN FENG (author) / SHEN QIAN (author) / ZHOU HAIBO (author)
2023-08-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
FORMWORK FIXING MEMBER AND FORMWORK FIXING BRACKET FOR CONCRETE RETAINING WALL
European Patent Office | 2020
|Linear coping concrete formwork fixing structure, formwork system and construction method
European Patent Office | 2024
|Fixing device and method for concrete structure formwork
European Patent Office | 2024
|Adjustable beam formwork fixing clamp and beam formwork fixing method
European Patent Office | 2020
|