Fabricated vertical component microgravity rapid and accurate connection construction method
The invention relates to the related technical field of building construction, in particular to a microgravity rapid and accurate connection construction method for fabricated vertical components. The microgravity rapid and accurate connection construction method for the fabricated vertical components comprises the steps of a shaping sleeve manufacturing process, a shaping sleeve mounting process, a conversion layer steel bar reserving and embedding process, a conversion layer concrete pouring process, a conversion layer positioning bar position rechecking process, a vertical component mounting process and a grouting preparation process. A microgravity grouting process and a working face cleaning process; grouting material flow is injected into the connecting part of the vertical component through gravitational potential energy in the microgravity grouting process, and the problem of bin explosion caused by too large pressure can be effectively avoided.
本发明涉及建筑施工相关技术领域,具体为一种装配式竖向构件微重力快速精准连接施工方法,所述装配式竖向构件微重力快速精准连接施工方法包括定型化套筒制作过程、定型化套筒安装过程、转换层钢筋预留预埋过程、转换层混凝土浇筑过程、转换层定位筋位置复核过程、竖向构件安装过程、灌浆准备过程、微重力灌浆过程和作业面清理过程;通过微重力灌浆过程中利用重力势能将灌浆料流注入竖向构件连接部位,可以有效避免压力过大而爆仓的问题。
Fabricated vertical component microgravity rapid and accurate connection construction method
The invention relates to the related technical field of building construction, in particular to a microgravity rapid and accurate connection construction method for fabricated vertical components. The microgravity rapid and accurate connection construction method for the fabricated vertical components comprises the steps of a shaping sleeve manufacturing process, a shaping sleeve mounting process, a conversion layer steel bar reserving and embedding process, a conversion layer concrete pouring process, a conversion layer positioning bar position rechecking process, a vertical component mounting process and a grouting preparation process. A microgravity grouting process and a working face cleaning process; grouting material flow is injected into the connecting part of the vertical component through gravitational potential energy in the microgravity grouting process, and the problem of bin explosion caused by too large pressure can be effectively avoided.
本发明涉及建筑施工相关技术领域,具体为一种装配式竖向构件微重力快速精准连接施工方法,所述装配式竖向构件微重力快速精准连接施工方法包括定型化套筒制作过程、定型化套筒安装过程、转换层钢筋预留预埋过程、转换层混凝土浇筑过程、转换层定位筋位置复核过程、竖向构件安装过程、灌浆准备过程、微重力灌浆过程和作业面清理过程;通过微重力灌浆过程中利用重力势能将灌浆料流注入竖向构件连接部位,可以有效避免压力过大而爆仓的问题。
Fabricated vertical component microgravity rapid and accurate connection construction method
一种装配式竖向构件微重力快速精准连接施工方法
GAO WEI (author) / ZHANG YE (author) / WANG YONG (author) / WANG SHUYUAN (author) / SHANG LIUWEI (author) / YUE CHANGFAN (author) / SONG WENBO (author) / ZHU LEI (author) / FENG ZEQUAN (author) / LIU HENG (author)
2023-08-01
Patent
Electronic Resource
Chinese
Honeycomb-shaped fabricated building component and vertical connection method
European Patent Office | 2024
|Fabricated concrete shear wall vertical connection joint and construction method
European Patent Office | 2022
|Construction method for vertical component of fabricated residential structure
European Patent Office | 2023
|Grouting reversed-sequence construction method for fabricated vertical component
European Patent Office | 2021
|Fully-fabricated concrete shear wall vertical connection joint (and construction method)
European Patent Office | 2023
|