A platform for research: civil engineering, architecture and urbanism
Building roof drainage structure and construction method thereof
The invention relates to the technical field of building repair, and discloses a building roof drainage structure and a construction method thereof.The building roof drainage structure comprises an upper sleeve, a connecting core pipe, a drainage pipe and a flow guide pipe which are sequentially communicated; mounting holes for mounting the upper sleeves are formed in a plurality of water leakage positions of the building roof; a plurality of fixing holes for fixing the upper sleeve in the mounting hole are formed in the upper sleeve; the drainage tube is vertically arranged; the flow guide pipe is obliquely arranged along the horizontal plane and is used for conveying leaked water to a water collecting pit; the flow guide pipes of the drainage structures are communicated into a whole. The structure is easy to install and convenient to construct, the problem of water leakage of a current building roof is rapidly and efficiently solved, time and labor are saved, materials are cheap, and the labor cost and the material cost are greatly reduced.
本发明涉及建筑修复技术领域,公开了一种建筑屋顶泄水结构及其施工方法,包括依次连通的上部套管、连接芯管、引流管与导流管;所述建筑屋顶若干漏水处均开设有用于安装所述上部套管的安装孔;所述上部套管上开设有若干用于所述上部套管固定在所述安装孔中的固定孔;所述引流管竖直设置;所述导流管沿水平面倾斜设置,用于将漏水输送至集水坑;若干泄水结构的导流管连通为整体。结构安装简单,施工方便,以快速、高效地解决当前建筑屋顶渗漏水问题,省时省力并且材料便宜,人工费用以及材料费用大大减少。
Building roof drainage structure and construction method thereof
The invention relates to the technical field of building repair, and discloses a building roof drainage structure and a construction method thereof.The building roof drainage structure comprises an upper sleeve, a connecting core pipe, a drainage pipe and a flow guide pipe which are sequentially communicated; mounting holes for mounting the upper sleeves are formed in a plurality of water leakage positions of the building roof; a plurality of fixing holes for fixing the upper sleeve in the mounting hole are formed in the upper sleeve; the drainage tube is vertically arranged; the flow guide pipe is obliquely arranged along the horizontal plane and is used for conveying leaked water to a water collecting pit; the flow guide pipes of the drainage structures are communicated into a whole. The structure is easy to install and convenient to construct, the problem of water leakage of a current building roof is rapidly and efficiently solved, time and labor are saved, materials are cheap, and the labor cost and the material cost are greatly reduced.
本发明涉及建筑修复技术领域,公开了一种建筑屋顶泄水结构及其施工方法,包括依次连通的上部套管、连接芯管、引流管与导流管;所述建筑屋顶若干漏水处均开设有用于安装所述上部套管的安装孔;所述上部套管上开设有若干用于所述上部套管固定在所述安装孔中的固定孔;所述引流管竖直设置;所述导流管沿水平面倾斜设置,用于将漏水输送至集水坑;若干泄水结构的导流管连通为整体。结构安装简单,施工方便,以快速、高效地解决当前建筑屋顶渗漏水问题,省时省力并且材料便宜,人工费用以及材料费用大大减少。
Building roof drainage structure and construction method thereof
一种建筑屋顶泄水结构及其施工方法
LIU HANKUN (author) / SUN YANRONG (author) / LI HONGBING (author) / WU TI (author)
2023-08-01
Patent
Electronic Resource
Chinese
Building roof efficient drainage structure and construction method thereof
European Patent Office | 2024
|Roof greening drainage structure and construction method thereof
European Patent Office | 2020
|Planted roof drainage structure and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|