A platform for research: civil engineering, architecture and urbanism
The road and bridge crack reinforcing device comprises a vehicle body, a handle, trundles, a steel chisel storage assembly, a steel chisel mounting assembly, a concrete pouring assembly and steel chisels. Through the arrangement of the vehicle body, the handle, the trundles, the steel chisel storage assembly, the steel chisel installation assembly, the concrete pouring assembly and the steel chisel, the functions of moving, steel chisel storage, steel chisel installation, concrete pouring and the like are integrated, when the device is used, an inverted-U-shaped groove is formed near the damaged position of a bridge through a percussion drill, the steel chisel storage assembly is started, and the steel chisel installation assembly is started; the steel chisel falls on the steel chisel installation bottom plate, then the steel chisel installation assembly is started, the steel chisel is installed in the U-shaped groove, then the concrete pouring assembly is started, pouring and reinforcing are conducted on the crack, the labor intensity of workers is relieved, the reinforcing cost is reduced, and the working efficiency is improved.
一种道路桥梁裂缝加固装置及加固方法包括:车体、把手、脚轮、钢钎存储组件、钢钎安装组件、混凝土浇筑组件和钢钎;通过设置车体、把手、脚轮、钢钎存储组件、钢钎安装组件、混凝土浇筑组件和钢钎,将移动、钢钎存储、钢钎安装和混凝土浇筑等功能集于一体,本装置在使用时,在桥梁破损处附近使用冲击钻开出倒置U型的槽,启动钢钎存储组件,将钢钎落到钢钎安装底板上,再启动钢钎安装组件,将钢钎安装到U型槽中,随后再启动混凝土浇筑组件,对裂缝处进行浇筑加固,减少了人工劳动强度,降低了加固成本,提高了工作效率。
The road and bridge crack reinforcing device comprises a vehicle body, a handle, trundles, a steel chisel storage assembly, a steel chisel mounting assembly, a concrete pouring assembly and steel chisels. Through the arrangement of the vehicle body, the handle, the trundles, the steel chisel storage assembly, the steel chisel installation assembly, the concrete pouring assembly and the steel chisel, the functions of moving, steel chisel storage, steel chisel installation, concrete pouring and the like are integrated, when the device is used, an inverted-U-shaped groove is formed near the damaged position of a bridge through a percussion drill, the steel chisel storage assembly is started, and the steel chisel installation assembly is started; the steel chisel falls on the steel chisel installation bottom plate, then the steel chisel installation assembly is started, the steel chisel is installed in the U-shaped groove, then the concrete pouring assembly is started, pouring and reinforcing are conducted on the crack, the labor intensity of workers is relieved, the reinforcing cost is reduced, and the working efficiency is improved.
一种道路桥梁裂缝加固装置及加固方法包括:车体、把手、脚轮、钢钎存储组件、钢钎安装组件、混凝土浇筑组件和钢钎;通过设置车体、把手、脚轮、钢钎存储组件、钢钎安装组件、混凝土浇筑组件和钢钎,将移动、钢钎存储、钢钎安装和混凝土浇筑等功能集于一体,本装置在使用时,在桥梁破损处附近使用冲击钻开出倒置U型的槽,启动钢钎存储组件,将钢钎落到钢钎安装底板上,再启动钢钎安装组件,将钢钎安装到U型槽中,随后再启动混凝土浇筑组件,对裂缝处进行浇筑加固,减少了人工劳动强度,降低了加固成本,提高了工作效率。
Road and bridge crack reinforcing device and reinforcing method
一种道路桥梁裂缝加固装置及加固方法
ZHOU ZE (author)
2023-08-04
Patent
Electronic Resource
Chinese
Road and bridge crack reinforcing device and reinforcing method
European Patent Office | 2024
|Road and bridge crack reinforcing device and reinforcing method
European Patent Office | 2024
|