Municipal inspection well cover mounting method
The municipal inspection well cover mounting method comprises the following mounting steps that S1, a preparation process is conducted, specifically, a road surface is cut through a cutting machine, an annular groove slightly larger than a well cover body is cut out, the annular groove is cleaned, and the annular groove is filled with bottom layer concrete, so that the well cover body is horizontally placed conveniently; s2, embedded steel bar installation is conducted, specifically, reinforcing steel bars are inserted into inserting holes in the well lid body through a steel bar embedding device; and S3, accurate lowering is conducted, specifically, the well lid body is supported through a T-shaped rod, the T-shaped rod is driven by a driving device to move, and finally supporting on the well lid body is relieved, so that the well lid body falls into the annular groove. According to the anti-falling well lid, through cooperative use of the structures, the problems that in the actual use process, due to the fact that the installation process of a traditional anti-falling well lid is limited by an installation method, the firmness degree of contact between the well lid and the surrounding road surface is limited, and potential safety hazards still exist in installation and use of the well lid are solved.
本发明公开了一种市政窨井盖安装方法,包括以下安装步骤:S1、准备过程:利用切割机对路面进行切割,切割出略大于井盖本体的环形凹槽,并对环形凹槽进行清理,在环形凹槽内填充底层混凝土,便于井盖本体的水平放置;S2、植筋安装:通过植筋装置在井盖本体上的插放孔内插入加固钢筋;S3、准确下放:通过T形杆完成对井盖本体的支撑,通过驱动装置带动T形杆移动,并最终解除对井盖本体的支撑,使得井盖本体下落在环形凹槽中。本发明,通过上述结构之间的配合使用,解决了在实际使用过程中,由于传统防坠井盖的井盖在安装过程中,受限于安装方法,使得井盖与周围路面接触的牢固程度有限,致使井盖的安装使用仍存在安全隐患的问题。
Municipal inspection well cover mounting method
The municipal inspection well cover mounting method comprises the following mounting steps that S1, a preparation process is conducted, specifically, a road surface is cut through a cutting machine, an annular groove slightly larger than a well cover body is cut out, the annular groove is cleaned, and the annular groove is filled with bottom layer concrete, so that the well cover body is horizontally placed conveniently; s2, embedded steel bar installation is conducted, specifically, reinforcing steel bars are inserted into inserting holes in the well lid body through a steel bar embedding device; and S3, accurate lowering is conducted, specifically, the well lid body is supported through a T-shaped rod, the T-shaped rod is driven by a driving device to move, and finally supporting on the well lid body is relieved, so that the well lid body falls into the annular groove. According to the anti-falling well lid, through cooperative use of the structures, the problems that in the actual use process, due to the fact that the installation process of a traditional anti-falling well lid is limited by an installation method, the firmness degree of contact between the well lid and the surrounding road surface is limited, and potential safety hazards still exist in installation and use of the well lid are solved.
本发明公开了一种市政窨井盖安装方法,包括以下安装步骤:S1、准备过程:利用切割机对路面进行切割,切割出略大于井盖本体的环形凹槽,并对环形凹槽进行清理,在环形凹槽内填充底层混凝土,便于井盖本体的水平放置;S2、植筋安装:通过植筋装置在井盖本体上的插放孔内插入加固钢筋;S3、准确下放:通过T形杆完成对井盖本体的支撑,通过驱动装置带动T形杆移动,并最终解除对井盖本体的支撑,使得井盖本体下落在环形凹槽中。本发明,通过上述结构之间的配合使用,解决了在实际使用过程中,由于传统防坠井盖的井盖在安装过程中,受限于安装方法,使得井盖与周围路面接触的牢固程度有限,致使井盖的安装使用仍存在安全隐患的问题。
Municipal inspection well cover mounting method
一种市政窨井盖安装方法
TANG YONGDA (author)
2023-08-04
Patent
Electronic Resource
Chinese