Mortise and tenon type curtain wall connecting method
The invention discloses a mortise and tenon type curtain wall connecting method, and relates to the technical field of curtain wall connecting methods. Comprising the following steps that after reinforcing steel bars are bound, the position of an embedded part is found according to a drawing, one end of a first mortise of the embedded part is welded to the reinforcing steel bars, and filler is plugged into the mortise; and concrete construction is completed, and the formwork is disassembled. And the mortises are cleaned, and a layer of glue is brushed. And a layer of glue is brushed inside, and then the rubber gasket is put into the mortise I of the embedded part according to the direction. A curtain wall accessory tenon tongue II is placed in the mortise I; the positions of the second tenon and the first mortise are adjusted, and a gasket is placed in a gap between the second tenon and the first mortise; the wedge is plugged into the plug hole; curtain wall accessories are cleaned by connecting the tenon shoulders with the tenon tongues; gluing is conducted in the third tenon tongue; the mortise III of the main keel is in mortise and tenon connection with the tenon II; a third tenon tongue is cleaned up and connected with a third mortise; the fourth tenon and the third mortise are connected in a mortise and tenon mode. The mortise and tenon joint structure is combined with the concrete to achieve curtain wall connection.
本发明公开了一种榫卯式幕墙连接方法,涉及幕墙连接方法技术领域。包括以下步骤,绑扎钢筋之后,按照图纸找到预埋件的位置,将其榫眼一的一端与钢筋焊接,并往榫眼塞入填充物;混泥土施工完成,拆完模板之后。清理榫眼,并刷上一层胶水。先在内部刷上一层胶水然后将橡胶垫片按照方向放入预埋件榫眼一内。将幕墙配件榫舌二放入榫眼一内;调整榫舌二与榫眼一的位置,在其空隙处放入垫片;将楔塞入塞孔;将幕墙配件由榫肩连着榫舌清理干净;在榫舌三内涂胶;将主龙骨榫眼三与榫舌二榫卯连接;榫舌三清理干净与榫眼三连接;榫舌四与榫眼三进行榫卯连接。本发明实现了榫卯结构结合混凝土实现幕墙连接。
Mortise and tenon type curtain wall connecting method
The invention discloses a mortise and tenon type curtain wall connecting method, and relates to the technical field of curtain wall connecting methods. Comprising the following steps that after reinforcing steel bars are bound, the position of an embedded part is found according to a drawing, one end of a first mortise of the embedded part is welded to the reinforcing steel bars, and filler is plugged into the mortise; and concrete construction is completed, and the formwork is disassembled. And the mortises are cleaned, and a layer of glue is brushed. And a layer of glue is brushed inside, and then the rubber gasket is put into the mortise I of the embedded part according to the direction. A curtain wall accessory tenon tongue II is placed in the mortise I; the positions of the second tenon and the first mortise are adjusted, and a gasket is placed in a gap between the second tenon and the first mortise; the wedge is plugged into the plug hole; curtain wall accessories are cleaned by connecting the tenon shoulders with the tenon tongues; gluing is conducted in the third tenon tongue; the mortise III of the main keel is in mortise and tenon connection with the tenon II; a third tenon tongue is cleaned up and connected with a third mortise; the fourth tenon and the third mortise are connected in a mortise and tenon mode. The mortise and tenon joint structure is combined with the concrete to achieve curtain wall connection.
本发明公开了一种榫卯式幕墙连接方法,涉及幕墙连接方法技术领域。包括以下步骤,绑扎钢筋之后,按照图纸找到预埋件的位置,将其榫眼一的一端与钢筋焊接,并往榫眼塞入填充物;混泥土施工完成,拆完模板之后。清理榫眼,并刷上一层胶水。先在内部刷上一层胶水然后将橡胶垫片按照方向放入预埋件榫眼一内。将幕墙配件榫舌二放入榫眼一内;调整榫舌二与榫眼一的位置,在其空隙处放入垫片;将楔塞入塞孔;将幕墙配件由榫肩连着榫舌清理干净;在榫舌三内涂胶;将主龙骨榫眼三与榫舌二榫卯连接;榫舌三清理干净与榫眼三连接;榫舌四与榫眼三进行榫卯连接。本发明实现了榫卯结构结合混凝土实现幕墙连接。
Mortise and tenon type curtain wall connecting method
一种榫卯式幕墙连接方法
LU QINGCHENG (author) / YANG JIE (author) / HUANG ZHI (author)
2023-08-04
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Mortise and tenon type pultrusion profile connecting node and connecting method
European Patent Office | 2022
|European Patent Office | 2024
|Mortise and tenon self-locking assembly type wall column joint connecting structure
European Patent Office | 2020
|