A platform for research: civil engineering, architecture and urbanism
The invention provides a steel column butt joint device facilitating steel column butt joint construction, aims to improve the steel column butt joint construction efficiency and reduce the construction cost, and relates to the technical field of steel column butt joint. The steel column butt joint device comprises a first annular plate, a second annular plate and a jacking mechanism. The first annular plate is provided with a plurality of first clamping mechanisms which are arranged around the through holes of the first annular plate and used for clamping and fixing the steel columns in the through holes of the first annular plate. The second annular plate is provided with a plurality of second clamping mechanisms which are arranged around the through holes of the second annular plate and used for clamping and fixing the steel columns in the through holes of the second annular plate. The first annular plate and the second annular plate are coaxially arranged, the jacking mechanism is arranged between the first annular plate and the second annular plate, one end of the jacking mechanism is connected with the first annular plate, and the other end of the jacking mechanism is connected with the second annular plate. The construction quality and safety are improved, the overwork process is simple, temporary lug plates, connecting plates and the like do not need to be welded and cut off, the method is suitable for site construction, and the steel column butt joint construction cost and construction efficiency can be improved.
本发明是提供一种便于钢柱对接施工的钢柱对接装置,以提高钢柱对接施工的效率和施工成本,涉及钢柱对接技术领域。钢柱对接装置,包括第一环板、第二环板和顶升机构;所述第一环板上设有多个绕其通孔设置以用于将钢柱夹紧固定在其通孔内的第一夹紧机构,所述第二环板上设有多个绕其通孔设置以用于将钢柱夹紧固定在其通孔内的第二夹紧机构;所述第一环板与第二环板同轴设置,所述顶升机构设置在第一环板与第二环板之间,且一端与第一环板连接,另一端与第二环板连接。本发明提高了施工质量和安全性,其超作过程简单,不需要焊接和割除临时耳板、连接板等,适用于现场施工,可以提高钢柱对接施工成本和施工效率。
The invention provides a steel column butt joint device facilitating steel column butt joint construction, aims to improve the steel column butt joint construction efficiency and reduce the construction cost, and relates to the technical field of steel column butt joint. The steel column butt joint device comprises a first annular plate, a second annular plate and a jacking mechanism. The first annular plate is provided with a plurality of first clamping mechanisms which are arranged around the through holes of the first annular plate and used for clamping and fixing the steel columns in the through holes of the first annular plate. The second annular plate is provided with a plurality of second clamping mechanisms which are arranged around the through holes of the second annular plate and used for clamping and fixing the steel columns in the through holes of the second annular plate. The first annular plate and the second annular plate are coaxially arranged, the jacking mechanism is arranged between the first annular plate and the second annular plate, one end of the jacking mechanism is connected with the first annular plate, and the other end of the jacking mechanism is connected with the second annular plate. The construction quality and safety are improved, the overwork process is simple, temporary lug plates, connecting plates and the like do not need to be welded and cut off, the method is suitable for site construction, and the steel column butt joint construction cost and construction efficiency can be improved.
本发明是提供一种便于钢柱对接施工的钢柱对接装置,以提高钢柱对接施工的效率和施工成本,涉及钢柱对接技术领域。钢柱对接装置,包括第一环板、第二环板和顶升机构;所述第一环板上设有多个绕其通孔设置以用于将钢柱夹紧固定在其通孔内的第一夹紧机构,所述第二环板上设有多个绕其通孔设置以用于将钢柱夹紧固定在其通孔内的第二夹紧机构;所述第一环板与第二环板同轴设置,所述顶升机构设置在第一环板与第二环板之间,且一端与第一环板连接,另一端与第二环板连接。本发明提高了施工质量和安全性,其超作过程简单,不需要焊接和割除临时耳板、连接板等,适用于现场施工,可以提高钢柱对接施工成本和施工效率。
Steel column butt joint device
钢柱对接装置
2023-08-04
Patent
Electronic Resource
Chinese
Steel column butt joint supporting frame and steel column butt joint construction method
European Patent Office | 2024
|European Patent Office | 2023
|