A platform for research: civil engineering, architecture and urbanism
Mounting bracket for construction of mold bag pile
The invention discloses a mounting bracket for mold bag pile construction, which comprises a mounting unit, a driving assembly, a rotating assembly and a stretching assembly which are respectively connected with the driving assembly, a clamping assembly connected with the stretching assembly, and a horizontal moving assembly connected with the rotating assembly. The method has the beneficial effects that switching pouring of the two mold bag piles can be achieved within a short time (namely, pouring continues before initial setting of concrete of the front mold bag piles), so that mold bags can be stably and evenly filled, and the situation that the construction pouring progress is delayed due to damage caused by excessive expansion of the mold bags due to one-time pouring is reduced; when the motor drives the rotating assembly to be located at a left pole or a right pole, the steel rope is in a lifted and tightened state, meanwhile, the third sliding block is pulled up to drive the two clamping jaws to be close to each other, so that the clamping jaws clamp and fix the pouring pipeline, and manual pouring is replaced with machinery; occupational disease harm (occupational arm shock/arm shock disease) caused by manual handheld pouring is further reduced, and the labor cost is saved.
本发明公开了一种用于模袋桩施工的安装支架,包括安装单元,包括驱动组件、分别与驱动组件连接的转动组件和拉伸组件、与拉伸组件连接的夹持组件,以及与转动组件连接的水平移动组件。本发明的有益效果为不仅能在短时间(即在前模袋桩混凝土初凝之前继续浇筑)内实现对两个模袋桩进行切换浇筑,使得模袋能够稳定均匀的被填充,减少因一次性浇筑造成的模袋过分膨胀产生的破环导致施工浇筑进度延误,还能当电机驱动转动组件处于左或右极点时,钢绳处于被提升和紧绷的状态,同时第三滑块被拉升,带动两个夹爪互相靠近实现夹爪对浇筑管道的夹持固定,实现用机械代替人工进行浇筑,进一步减少因人工手持浇筑而带来的职业病危害(职业性手臂震/手臂震动病),节约了人工成本。
Mounting bracket for construction of mold bag pile
The invention discloses a mounting bracket for mold bag pile construction, which comprises a mounting unit, a driving assembly, a rotating assembly and a stretching assembly which are respectively connected with the driving assembly, a clamping assembly connected with the stretching assembly, and a horizontal moving assembly connected with the rotating assembly. The method has the beneficial effects that switching pouring of the two mold bag piles can be achieved within a short time (namely, pouring continues before initial setting of concrete of the front mold bag piles), so that mold bags can be stably and evenly filled, and the situation that the construction pouring progress is delayed due to damage caused by excessive expansion of the mold bags due to one-time pouring is reduced; when the motor drives the rotating assembly to be located at a left pole or a right pole, the steel rope is in a lifted and tightened state, meanwhile, the third sliding block is pulled up to drive the two clamping jaws to be close to each other, so that the clamping jaws clamp and fix the pouring pipeline, and manual pouring is replaced with machinery; occupational disease harm (occupational arm shock/arm shock disease) caused by manual handheld pouring is further reduced, and the labor cost is saved.
本发明公开了一种用于模袋桩施工的安装支架,包括安装单元,包括驱动组件、分别与驱动组件连接的转动组件和拉伸组件、与拉伸组件连接的夹持组件,以及与转动组件连接的水平移动组件。本发明的有益效果为不仅能在短时间(即在前模袋桩混凝土初凝之前继续浇筑)内实现对两个模袋桩进行切换浇筑,使得模袋能够稳定均匀的被填充,减少因一次性浇筑造成的模袋过分膨胀产生的破环导致施工浇筑进度延误,还能当电机驱动转动组件处于左或右极点时,钢绳处于被提升和紧绷的状态,同时第三滑块被拉升,带动两个夹爪互相靠近实现夹爪对浇筑管道的夹持固定,实现用机械代替人工进行浇筑,进一步减少因人工手持浇筑而带来的职业病危害(职业性手臂震/手臂震动病),节约了人工成本。
Mounting bracket for construction of mold bag pile
一种用于模袋桩施工的安装支架
YUAN PENG (author) / CHEN TAO (author) / ZHOU JIAN (author) / LI MENG (author) / DENG BO (author) / QIU HONGZHI (author) / HE YUNFENG (author) / HE YINGJIAN (author) / LI LIANSHU (author) / YIN ZI (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen