Super high-rise fabricated grating curtain wall mounting mechanism and mounting method thereof
The invention discloses a super high-rise fabricated grating curtain wall mounting mechanism and a mounting method thereof, and belongs to the technical field of engineering construction.The super high-rise fabricated grating curtain wall mounting method comprises the following steps that a drawing is optimized; grilles and modeling aluminum plates are machined in a machining factory and assembled in the machining factory according to drawings, and plate type grille units are formed; paying off on site, if the inspection is unqualified, continuing to inspect after rectification, and if the inspection is qualified, installing the keel; and keel installation and assembly type grid curtain wall hoisting, specifically, the plate type grid units are hoisted to the to-be-installed positions, and installation is completed. The grid and the modeling aluminum plate which are assembled on a construction site in the prior art are assembled in a processing plant by adopting an assembly technology and then transported to the construction site to be integrally hoisted, so that the mounting effect is improved, the construction period is shortened, the quality of assembly in the processing plant can be ensured, the subsequent maintenance is reduced, and the construction cost is reduced. And good economic benefits and social benefits are achieved.
本发明公开了一种超高层装配式格栅幕墙安装机构及其安装方法,属于工程施工技术领域,超高层装配式格栅幕墙安装方法,包括以下步骤:图纸优化;在加工厂中加工出格栅、造型铝板,并在加工厂中按照图纸进行组装,形成板块式格栅单元;现场放线,若检查不合格,则整改后继续检查,若检查合格,则进行龙骨安装;龙骨安装,装配式格栅幕墙吊装:将板块式格栅单元吊装到待安装位置,并完成安装。该发明将现有技术中在施工现场组装的格栅、造型铝板采取装配式技术,在加工厂进行组装好后运至施工现场进行整体吊装,提高了安装功效,节约了施工工期,且在加工厂进行组装的质量也能得到保证,减少了后续维修,具有良好的经济效益和社会效益。
Super high-rise fabricated grating curtain wall mounting mechanism and mounting method thereof
The invention discloses a super high-rise fabricated grating curtain wall mounting mechanism and a mounting method thereof, and belongs to the technical field of engineering construction.The super high-rise fabricated grating curtain wall mounting method comprises the following steps that a drawing is optimized; grilles and modeling aluminum plates are machined in a machining factory and assembled in the machining factory according to drawings, and plate type grille units are formed; paying off on site, if the inspection is unqualified, continuing to inspect after rectification, and if the inspection is qualified, installing the keel; and keel installation and assembly type grid curtain wall hoisting, specifically, the plate type grid units are hoisted to the to-be-installed positions, and installation is completed. The grid and the modeling aluminum plate which are assembled on a construction site in the prior art are assembled in a processing plant by adopting an assembly technology and then transported to the construction site to be integrally hoisted, so that the mounting effect is improved, the construction period is shortened, the quality of assembly in the processing plant can be ensured, the subsequent maintenance is reduced, and the construction cost is reduced. And good economic benefits and social benefits are achieved.
本发明公开了一种超高层装配式格栅幕墙安装机构及其安装方法,属于工程施工技术领域,超高层装配式格栅幕墙安装方法,包括以下步骤:图纸优化;在加工厂中加工出格栅、造型铝板,并在加工厂中按照图纸进行组装,形成板块式格栅单元;现场放线,若检查不合格,则整改后继续检查,若检查合格,则进行龙骨安装;龙骨安装,装配式格栅幕墙吊装:将板块式格栅单元吊装到待安装位置,并完成安装。该发明将现有技术中在施工现场组装的格栅、造型铝板采取装配式技术,在加工厂进行组装好后运至施工现场进行整体吊装,提高了安装功效,节约了施工工期,且在加工厂进行组装的质量也能得到保证,减少了后续维修,具有良好的经济效益和社会效益。
Super high-rise fabricated grating curtain wall mounting mechanism and mounting method thereof
一种超高层装配式格栅幕墙安装机构及其安装方法
JIN YONG (author) / CUI XUAN (author) / ZHAO JIANBAO (author) / DENG TUANHUI (author) / LI MINCHAO (author) / ZHANG QINRONG (author) / ZHAI YIRUN (author) / MAO RUI (author) / HE SHUYUAN (author)
2023-08-08
Patent
Electronic Resource
Chinese
Super high-rise unit type curtain wall mounting equipment
European Patent Office | 2022
|Super high-rise vibration isolation curtain wall structure and mounting method thereof
European Patent Office | 2023
|Annular steel track for mounting super high-rise curtain wall
European Patent Office | 2024
|Fabricated building curtain wall and mounting method thereof
European Patent Office | 2020
|