A platform for research: civil engineering, architecture and urbanism
Steel tube bundle combined shear wall
A steel tube bundle combined shear wall comprises prefabricated wall panels, a splicing end A and a splicing end B are arranged at the two ends of each prefabricated wall panel respectively, and the splicing end A is connected with the splicing end B of another adjacent prefabricated wall panel; the guide connecting assembly comprises a first guide part arranged at the splicing end A and a second guide part arranged at the splicing end B, the first guide part comprises a pouring pipe used for stabilizing the splicing end A, the pouring pipe is communicated with the splicing end A, the second guide part comprises a communicating groove with a positioning function relative to the pouring pipe, and the pouring pipe is communicated with the communicating groove; a connecting piece is arranged between the first guide part and the second guide part; the prefabricated wall panel is provided with a prefabricated part and a rear building part, the prefabricated part is used for stabilizing the splicing end B and positioning the splicing end A, and the rear building part is used for stabilizing the splicing end A. The shear wall connection construction efficiency can be improved, and the bending and shearing resistance of the shear wall connection position is enhanced.
一种钢管束组合剪力墙,包括,预制墙板,预制墙板两端分设有拼接A端和拼接B端,拼接A端与相邻另一预制墙板的拼接B端连接;导向连接组件,导向连接组件包括设置在拼接A端的第一导向部和设置在拼接B端的第二导向部,第一导向部包括用于稳固拼接A端的浇筑管,浇筑管与拼接A端连通,第二导向部包括相对于浇筑管具有定位作用的连通槽,浇筑管与连通槽连通,第一导向部与第二导向部之间设置有连接件;预制墙板上分设有预制部和后砌部,其中,预制部用于稳固拼接B端和定位拼接A端,后砌部用于稳固拼接A端。本发明能够实现提高剪力墙连接施工效率,增强剪力墙连接位置处的抗弯剪强度。
Steel tube bundle combined shear wall
A steel tube bundle combined shear wall comprises prefabricated wall panels, a splicing end A and a splicing end B are arranged at the two ends of each prefabricated wall panel respectively, and the splicing end A is connected with the splicing end B of another adjacent prefabricated wall panel; the guide connecting assembly comprises a first guide part arranged at the splicing end A and a second guide part arranged at the splicing end B, the first guide part comprises a pouring pipe used for stabilizing the splicing end A, the pouring pipe is communicated with the splicing end A, the second guide part comprises a communicating groove with a positioning function relative to the pouring pipe, and the pouring pipe is communicated with the communicating groove; a connecting piece is arranged between the first guide part and the second guide part; the prefabricated wall panel is provided with a prefabricated part and a rear building part, the prefabricated part is used for stabilizing the splicing end B and positioning the splicing end A, and the rear building part is used for stabilizing the splicing end A. The shear wall connection construction efficiency can be improved, and the bending and shearing resistance of the shear wall connection position is enhanced.
一种钢管束组合剪力墙,包括,预制墙板,预制墙板两端分设有拼接A端和拼接B端,拼接A端与相邻另一预制墙板的拼接B端连接;导向连接组件,导向连接组件包括设置在拼接A端的第一导向部和设置在拼接B端的第二导向部,第一导向部包括用于稳固拼接A端的浇筑管,浇筑管与拼接A端连通,第二导向部包括相对于浇筑管具有定位作用的连通槽,浇筑管与连通槽连通,第一导向部与第二导向部之间设置有连接件;预制墙板上分设有预制部和后砌部,其中,预制部用于稳固拼接B端和定位拼接A端,后砌部用于稳固拼接A端。本发明能够实现提高剪力墙连接施工效率,增强剪力墙连接位置处的抗弯剪强度。
Steel tube bundle combined shear wall
一种钢管束组合剪力墙
YOU PEIBO (author) / WU WANYING (author) / QIU FENG (author) / LI LEI (author) / YUAN RENZHOU (author) / GE KE (author) / MA YABING (author) / GAO SHIWEI (author) / ZHU YUBIN (author) / FAN HUA (author)
2023-08-08
Patent
Electronic Resource
Chinese
Concrete-filled steel tube bundle shear wall connecting structure
European Patent Office | 2024
|Self-compacting concrete filled steel tube bundle shear wall structure
European Patent Office | 2024
|European Patent Office | 2020
|Self-moving concrete pouring device for steel tube bundle shear wall
European Patent Office | 2022
|