A platform for research: civil engineering, architecture and urbanism
Building roof drainage structure convenient to unblock
The invention discloses a building roof drainage structure convenient to unblock, and relates to the field of roof drainage, the building roof drainage structure comprises a drainage pipe main body, an auxiliary auxiliary pipe is movably connected to the end of the drainage pipe main body, a dredging device is fixedly mounted in the auxiliary auxiliary pipe, and the dredging device comprises a first folding pipe, a second folding pipe and a control assembly; the first folding pipe and the second folding pipe are fixedly installed on the inner wall of the auxiliary auxiliary pipe. According to the drainage pipe, the caliber of the folding pipe in the protruding state is slightly smaller than that of the drainage pipe body, so that the blocked portion is mainly concentrated in the auxiliary auxiliary pipe, the states of the first folding pipe and the second folding pipe are changed through the control assembly, and the first folding pipe and the second folding pipe alternately form the protruding state; and the internal blocking object is pushed to move by utilizing the deformation of the folding pipe, so that the connecting part of the blocking object and the pipeline is in an unstable state, and the blocking is convenient to carry out.
本发明公开了一种便于通堵的建筑屋顶排水结构,涉及屋顶排水领域,包括排水管主体,所述排水管主体的端头处活动连接有辅助副管,所述辅助副管的内部固定安装有疏通装置,所述疏通装置包括第一折叠管、第二折叠管和操控组件,所述第一折叠管和第二折叠管均固定安装在辅助副管的内壁上。本发明,突出状态的折叠管处的口径略微小于排水管主体的口径,因此堵塞部位将会主要集中在辅助副管当中,通过操控组件来改变第一折叠管与第二折叠管的状态,让第一折叠管和第二折叠管交替成为突出状态,利用折叠管的形变来推动内部的堵塞物进行移动,此种方式可以让堵塞物与管道的连接部位在不稳定的状态,从而方便进行通堵。
Building roof drainage structure convenient to unblock
The invention discloses a building roof drainage structure convenient to unblock, and relates to the field of roof drainage, the building roof drainage structure comprises a drainage pipe main body, an auxiliary auxiliary pipe is movably connected to the end of the drainage pipe main body, a dredging device is fixedly mounted in the auxiliary auxiliary pipe, and the dredging device comprises a first folding pipe, a second folding pipe and a control assembly; the first folding pipe and the second folding pipe are fixedly installed on the inner wall of the auxiliary auxiliary pipe. According to the drainage pipe, the caliber of the folding pipe in the protruding state is slightly smaller than that of the drainage pipe body, so that the blocked portion is mainly concentrated in the auxiliary auxiliary pipe, the states of the first folding pipe and the second folding pipe are changed through the control assembly, and the first folding pipe and the second folding pipe alternately form the protruding state; and the internal blocking object is pushed to move by utilizing the deformation of the folding pipe, so that the connecting part of the blocking object and the pipeline is in an unstable state, and the blocking is convenient to carry out.
本发明公开了一种便于通堵的建筑屋顶排水结构,涉及屋顶排水领域,包括排水管主体,所述排水管主体的端头处活动连接有辅助副管,所述辅助副管的内部固定安装有疏通装置,所述疏通装置包括第一折叠管、第二折叠管和操控组件,所述第一折叠管和第二折叠管均固定安装在辅助副管的内壁上。本发明,突出状态的折叠管处的口径略微小于排水管主体的口径,因此堵塞部位将会主要集中在辅助副管当中,通过操控组件来改变第一折叠管与第二折叠管的状态,让第一折叠管和第二折叠管交替成为突出状态,利用折叠管的形变来推动内部的堵塞物进行移动,此种方式可以让堵塞物与管道的连接部位在不稳定的状态,从而方便进行通堵。
Building roof drainage structure convenient to unblock
一种便于通堵的建筑屋顶排水结构
WANG LESHENG (author) / LUO FEIDA (author) / LUO WEIKE (author) / LUO JINHUO (author) / LI PENGCHENG (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Solar photovoltaic power generation building roof convenient for sealing and drainage
European Patent Office | 2020
|Solar photovoltaic power generation building roof convenient for sealing and drainage
European Patent Office | 2020
|Green building with green building roof drainage structure
European Patent Office | 2023
|