A platform for research: civil engineering, architecture and urbanism
Dredging device for hydraulic engineering construction
According to the desilting device for water conservancy project construction, when river bottom silt needs to be cleaned, due to the fact that a traction mechanism can float on the water surface, after a fixing mechanism sinks in water, the traction mechanism and the fixing mechanism are connected through a first traction rope, and then the river bottom silt is cleaned through a desilting mechanism on the fixing mechanism; in the cleaning process, the fixing mechanism can also be fixedly connected to the river bottom, the desilting mechanism is prevented from flowing along with water flow in the desilting process, the floating box is pulled to the two sides through the second traction rope, the floating box drives the first traction rope to move, and the desilting effect is improved. And the first traction rope can move to the side wall of the floating box through the first shaft and the first L-shaped sliding rail in the moving process, so that sludge in the dredging mechanism can be taken out more easily after the fixing mechanism and the dredging mechanism float on the water surface.
一种水利工程建设用清淤装置,当需要清理河底淤泥的时候由于牵引机构可漂浮于水面上,固定机构沉于水中后通过第一牵引绳连接将牵引机构和固定机构之间连接,然后通过固定机构上的清淤机构对河底淤泥进行清理,在清理的过程中固定机构还可以固接在河底,防止在清淤的过程中清淤机构跟随水流流动,通过第二牵引绳将浮箱往两侧拉动,浮箱带第一牵引绳移动,第一牵引绳在移动的过程可以移动过程中通过第一轴第一L滑轨内移动到浮箱的侧壁上,使固定机构和清淤可以漂浮到水面上后可以更加容易的将清淤机构内的淤泥取出。
Dredging device for hydraulic engineering construction
According to the desilting device for water conservancy project construction, when river bottom silt needs to be cleaned, due to the fact that a traction mechanism can float on the water surface, after a fixing mechanism sinks in water, the traction mechanism and the fixing mechanism are connected through a first traction rope, and then the river bottom silt is cleaned through a desilting mechanism on the fixing mechanism; in the cleaning process, the fixing mechanism can also be fixedly connected to the river bottom, the desilting mechanism is prevented from flowing along with water flow in the desilting process, the floating box is pulled to the two sides through the second traction rope, the floating box drives the first traction rope to move, and the desilting effect is improved. And the first traction rope can move to the side wall of the floating box through the first shaft and the first L-shaped sliding rail in the moving process, so that sludge in the dredging mechanism can be taken out more easily after the fixing mechanism and the dredging mechanism float on the water surface.
一种水利工程建设用清淤装置,当需要清理河底淤泥的时候由于牵引机构可漂浮于水面上,固定机构沉于水中后通过第一牵引绳连接将牵引机构和固定机构之间连接,然后通过固定机构上的清淤机构对河底淤泥进行清理,在清理的过程中固定机构还可以固接在河底,防止在清淤的过程中清淤机构跟随水流流动,通过第二牵引绳将浮箱往两侧拉动,浮箱带第一牵引绳移动,第一牵引绳在移动的过程可以移动过程中通过第一轴第一L滑轨内移动到浮箱的侧壁上,使固定机构和清淤可以漂浮到水面上后可以更加容易的将清淤机构内的淤泥取出。
Dredging device for hydraulic engineering construction
一种水利工程建设用清淤装置
XIA DAZHONG (author) / XIAO JIAN (author) / YU YANG (author)
2023-08-11
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
Pipeline dredging device for hydraulic engineering construction
European Patent Office | 2022
|Dredging equipment for hydraulic engineering construction
European Patent Office | 2023
|River channel dredging device for hydraulic engineering construction
European Patent Office | 2023
|