Method for erecting attached lifting scaffold
The invention relates to the field of attached type lifting scaffolds, and discloses an attached type lifting scaffold erecting method which comprises the following steps that firstly, a plurality of vertical rods and walkway plates are prepared, and a bracket platform is erected and horizontally adjusted; secondly, a bottom walkway plate is laid on the bracket platform, the bottom walkway plate comprises a bottom suspension bridge plate and a bottom fixing plate, and the bottom suspension bridge plate is hinged to the bottom fixing plate; 3, vertical rods are installed, the bottoms of the vertical rods are connected with bottom walkway plates through bolts, and temporary supporting pieces are used for the vertical rods to ensure that the vertical rods are perpendicular to the bottom walkway plates; fourthly, a second-layer suspension bridge mechanism is installed on the vertical rod; the problem that when the suspension bridge plate is too long, the suspension bridge plate is difficult to pull up through a steel wire rope is solved.
本发明涉及附着式升降脚手架领域,公开了一种附着式升降脚手架搭设方法,包括以下步骤:步骤一、准备若干立杆和走道板,搭设托架平台并进行水平调整;步骤二、在托架平台上铺设底部走道板,底部走道板包括底部吊桥板和底部固定板,底部吊桥板和底部固定板铰接;步骤三、安装立杆,立杆底部和底部走道板螺栓连接,对立杆使用临时支撑件以保证立杆和底部走道板垂直;步骤四、在立杆上安装第二层的吊桥机构;以解决吊桥板的长度过长时,难以用钢丝绳拉起来的问题。
Method for erecting attached lifting scaffold
The invention relates to the field of attached type lifting scaffolds, and discloses an attached type lifting scaffold erecting method which comprises the following steps that firstly, a plurality of vertical rods and walkway plates are prepared, and a bracket platform is erected and horizontally adjusted; secondly, a bottom walkway plate is laid on the bracket platform, the bottom walkway plate comprises a bottom suspension bridge plate and a bottom fixing plate, and the bottom suspension bridge plate is hinged to the bottom fixing plate; 3, vertical rods are installed, the bottoms of the vertical rods are connected with bottom walkway plates through bolts, and temporary supporting pieces are used for the vertical rods to ensure that the vertical rods are perpendicular to the bottom walkway plates; fourthly, a second-layer suspension bridge mechanism is installed on the vertical rod; the problem that when the suspension bridge plate is too long, the suspension bridge plate is difficult to pull up through a steel wire rope is solved.
本发明涉及附着式升降脚手架领域,公开了一种附着式升降脚手架搭设方法,包括以下步骤:步骤一、准备若干立杆和走道板,搭设托架平台并进行水平调整;步骤二、在托架平台上铺设底部走道板,底部走道板包括底部吊桥板和底部固定板,底部吊桥板和底部固定板铰接;步骤三、安装立杆,立杆底部和底部走道板螺栓连接,对立杆使用临时支撑件以保证立杆和底部走道板垂直;步骤四、在立杆上安装第二层的吊桥机构;以解决吊桥板的长度过长时,难以用钢丝绳拉起来的问题。
Method for erecting attached lifting scaffold
一种附着式升降脚手架搭设方法
LUO HUA (author) / WANG XIAOCHUAN (author) / LEI XIANGYUN (author) / LUO CHUAN (author) / LIU QIANG (author) / CHEN KAILEI (author) / LI YINGTAO (author) / TANG SHUHANG (author) / HU TAO (author)
2023-08-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste