A platform for research: civil engineering, architecture and urbanism
Iron tower mounting device
The invention discloses an iron tower mounting device which comprises a foundation table, a main support, a first long screw rod, a fixed cylinder, a movable cylinder, a tensioning screw and a steel wire rope, the fixed cylinder is mounted by arranging a second long screw rod structure, and the movable cylinder capable of being controlled by the tensioning screw to slide up and down is arranged above the fixed cylinder. A first flange part is fixedly connected to the outer side of the top of the fixed cylinder, a second flange part is fixedly connected to the outer side of the top of the movable cylinder, a cross beam frame is fixedly connected between the two main supports located on the same side, the top end of a steel wire rope is fixed to the cross beam frame, and the bottom end of the steel wire rope penetrates through a guide hole in the second flange part and then is fixed to the first flange part. The capability of resisting crosswind of the electric power iron tower can be improved by applying stabilizing force towards the center to the main support through the steel wire rope.
本发明公开了一种铁塔安装装置,包括:基础台、主支架、第一长螺杆、固定筒、活动筒、张紧螺钉、钢丝绳,通过设置第二长螺杆结构进行安装固定筒,并在固定筒的上方设置由张紧螺钉操纵可以上下滑动的活动筒,固定筒的顶部外侧固定连接有第一法兰部,活动筒的顶部外侧固定连接有第二法兰部,并在位于同一侧的两个主支架之间固定连接有横梁架,将钢丝绳的顶端与横梁架固定,钢丝绳的底端穿过第二法兰部上的导向孔后与第一法兰部固定,依靠钢丝绳施加给主支架向中心的稳定力,能够提高电力铁塔抵抗横风的能力。
Iron tower mounting device
The invention discloses an iron tower mounting device which comprises a foundation table, a main support, a first long screw rod, a fixed cylinder, a movable cylinder, a tensioning screw and a steel wire rope, the fixed cylinder is mounted by arranging a second long screw rod structure, and the movable cylinder capable of being controlled by the tensioning screw to slide up and down is arranged above the fixed cylinder. A first flange part is fixedly connected to the outer side of the top of the fixed cylinder, a second flange part is fixedly connected to the outer side of the top of the movable cylinder, a cross beam frame is fixedly connected between the two main supports located on the same side, the top end of a steel wire rope is fixed to the cross beam frame, and the bottom end of the steel wire rope penetrates through a guide hole in the second flange part and then is fixed to the first flange part. The capability of resisting crosswind of the electric power iron tower can be improved by applying stabilizing force towards the center to the main support through the steel wire rope.
本发明公开了一种铁塔安装装置,包括:基础台、主支架、第一长螺杆、固定筒、活动筒、张紧螺钉、钢丝绳,通过设置第二长螺杆结构进行安装固定筒,并在固定筒的上方设置由张紧螺钉操纵可以上下滑动的活动筒,固定筒的顶部外侧固定连接有第一法兰部,活动筒的顶部外侧固定连接有第二法兰部,并在位于同一侧的两个主支架之间固定连接有横梁架,将钢丝绳的顶端与横梁架固定,钢丝绳的底端穿过第二法兰部上的导向孔后与第一法兰部固定,依靠钢丝绳施加给主支架向中心的稳定力,能够提高电力铁塔抵抗横风的能力。
Iron tower mounting device
一种铁塔安装装置
RUAN ZHIHENG (author) / YANG ZHIJIE (author) / PENG CHENGHAO (author) / HUANG CHENG (author) / ZHANG DAN (author) / XU XIUDA (author) / XIONG LINA (author)
2023-08-11
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Iron tower mounting device for wireless optical communication equipment
European Patent Office | 2023
|Iron tower mounting base based on 5G communication network
European Patent Office | 2023
|Fabricated base station iron tower and mounting method thereof
European Patent Office | 2024
|