Construction method for launching, tunneling and arriving of tunnel TBM (Tunnel Boring Machine)
The invention provides a tunnel TBM (Tunnel Boring Machine) starting, tunneling and arriving construction method. The method comprises the following steps: investigating and analyzing construction engineering geology and hydrogeological conditions; a construction plane is arranged, specifically, a TBM site and temporarily-built facilities are arranged, and construction electricity, production and domestic water, pollution discharge and environmental protection and construction video monitoring are arranged; performing normal tunneling construction of the TBM; the TBM arrival section is constructed; through the steps of geological and hydrological investigation and analysis design, construction plane arrangement, TBM starting construction, TBM normal tunneling construction and TBM arrival construction, the tunnel construction efficiency is improved, the construction feasibility is improved, the construction safety is guaranteed, and the method is wide in application range.
本发明提供了一种隧道TBM始发、掘进、到达的施工方法,包括:施工工程地质与水文地质条件进行考察及分析;施工平面布置:对TBM场地和临建设施布置,以及对施工用电、生产与生活用水、排污与环保、施工视频监控布置;TBM正常掘进施工;TBM到达段施工;本发明通过设计地质水文考察分析、施工平面设置、TBM始发施工、TBM正常掘进施工和TBM到达施工几大步骤,提高了隧道施工效率,提高了施工的可行性,保证的施工的安全性,本发明适用范围广。
Construction method for launching, tunneling and arriving of tunnel TBM (Tunnel Boring Machine)
The invention provides a tunnel TBM (Tunnel Boring Machine) starting, tunneling and arriving construction method. The method comprises the following steps: investigating and analyzing construction engineering geology and hydrogeological conditions; a construction plane is arranged, specifically, a TBM site and temporarily-built facilities are arranged, and construction electricity, production and domestic water, pollution discharge and environmental protection and construction video monitoring are arranged; performing normal tunneling construction of the TBM; the TBM arrival section is constructed; through the steps of geological and hydrological investigation and analysis design, construction plane arrangement, TBM starting construction, TBM normal tunneling construction and TBM arrival construction, the tunnel construction efficiency is improved, the construction feasibility is improved, the construction safety is guaranteed, and the method is wide in application range.
本发明提供了一种隧道TBM始发、掘进、到达的施工方法,包括:施工工程地质与水文地质条件进行考察及分析;施工平面布置:对TBM场地和临建设施布置,以及对施工用电、生产与生活用水、排污与环保、施工视频监控布置;TBM正常掘进施工;TBM到达段施工;本发明通过设计地质水文考察分析、施工平面设置、TBM始发施工、TBM正常掘进施工和TBM到达施工几大步骤,提高了隧道施工效率,提高了施工的可行性,保证的施工的安全性,本发明适用范围广。
Construction method for launching, tunneling and arriving of tunnel TBM (Tunnel Boring Machine)
一种隧道TBM始发、掘进、到达的施工方法
JIA XIANGFENG (author) / GU PEISHENG (author) / LIU KANG (author) / DAI LONG (author) / ZHANG JIAXIN (author) / LIU JUN (author) / ZHOU LIN (author)
2023-08-11
Patent
Electronic Resource
Chinese
Tunnel Boring Machine Development
British Library Conference Proceedings | 2008
|Engineering Index Backfile | 1955
Automotive engineering | 1978
|Tunnel Boring Machine Performance Study
NTIS | 1984
|