Dredging construction method for harbor basin
The invention discloses a harbor basin dredging construction method. The method comprises the steps of construction preparation, wherein an anti-fouling curtain is arranged on the outer side of a construction water area range; measuring the construction area by adopting a total station; a grab dredger is adopted for layered excavation, and a mud barge is adopted for transporting mud to a mud unloading point for outward throwing; foundation trench and inter-pile soil sea side excavation: extending a pipe head of a sand pump ship to a sea side part of an inter-pile area, and pumping mud and sand to form a sea side dredging section; excavation of soil between piles: excavating and dredging the soil between the piles by adopting a long-arm excavator ship; excavation is conducted on the bank side of the soil between the piles, wherein a long-arm excavator is adopted for excavation to form a bank side dredging section; all-terrain measurement is carried out, shallow points and shallow sweeping lines are determined, and the harbor basin shallow sweeping is carried out according to the shallow points and the shallow sweeping lines so as to ensure the dredging depth. According to the construction method, the problems that silt continuously moves and deposits in the digging groove, back silting is caused, and the dredging result is lost or reduced are solved, the dredging effect is guaranteed, and the dredging construction time is saved.
本发明公开了一种港池疏浚施工方法,包括:施工准备:在施工水域范围外侧布设防污帘;采用全站仪对施工区域进行测量;港池疏浚:采用抓斗挖泥船分层开挖,采用泥驳船将泥运至卸泥点外抛;基槽及桩间土海侧开挖:砂泵船管头伸至桩间区域的海侧部,抽泥抽砂形成海侧疏浚断面;桩间土开挖:采用长臂挖机船进行桩间土开挖疏浚;桩间土岸侧开挖:采用长臂挖机进行开挖形成岸侧疏浚断面;港池扫浅:进行全地形测量,确定浅点和扫浅线路,根据浅点和扫浅线路进行港池扫浅以确保疏浚深度。本发明的施工方法解决了泥沙不断运动并在挖槽中沉积,造成回淤,导致疏浚的成果丧失或减少的问题,保证了疏浚成效,节约了疏浚施工时间。
Dredging construction method for harbor basin
The invention discloses a harbor basin dredging construction method. The method comprises the steps of construction preparation, wherein an anti-fouling curtain is arranged on the outer side of a construction water area range; measuring the construction area by adopting a total station; a grab dredger is adopted for layered excavation, and a mud barge is adopted for transporting mud to a mud unloading point for outward throwing; foundation trench and inter-pile soil sea side excavation: extending a pipe head of a sand pump ship to a sea side part of an inter-pile area, and pumping mud and sand to form a sea side dredging section; excavation of soil between piles: excavating and dredging the soil between the piles by adopting a long-arm excavator ship; excavation is conducted on the bank side of the soil between the piles, wherein a long-arm excavator is adopted for excavation to form a bank side dredging section; all-terrain measurement is carried out, shallow points and shallow sweeping lines are determined, and the harbor basin shallow sweeping is carried out according to the shallow points and the shallow sweeping lines so as to ensure the dredging depth. According to the construction method, the problems that silt continuously moves and deposits in the digging groove, back silting is caused, and the dredging result is lost or reduced are solved, the dredging effect is guaranteed, and the dredging construction time is saved.
本发明公开了一种港池疏浚施工方法,包括:施工准备:在施工水域范围外侧布设防污帘;采用全站仪对施工区域进行测量;港池疏浚:采用抓斗挖泥船分层开挖,采用泥驳船将泥运至卸泥点外抛;基槽及桩间土海侧开挖:砂泵船管头伸至桩间区域的海侧部,抽泥抽砂形成海侧疏浚断面;桩间土开挖:采用长臂挖机船进行桩间土开挖疏浚;桩间土岸侧开挖:采用长臂挖机进行开挖形成岸侧疏浚断面;港池扫浅:进行全地形测量,确定浅点和扫浅线路,根据浅点和扫浅线路进行港池扫浅以确保疏浚深度。本发明的施工方法解决了泥沙不断运动并在挖槽中沉积,造成回淤,导致疏浚的成果丧失或减少的问题,保证了疏浚成效,节约了疏浚施工时间。
Dredging construction method for harbor basin
港池疏浚施工方法
BAI YINZHAN (author)
2023-08-15
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1906
|Engineering Index Backfile | 1898
Norfolk Harbor, Virginia (maintenance Dredging)
NTIS | 1973