A platform for research: civil engineering, architecture and urbanism
Foundation bottom plate pre-paving anti-sticking waterproof roll construction quality control method
The invention relates to the technical field of building construction, in particular to a construction quality control method for pre-paving and anti-sticking waterproof coiled materials on a foundation slab. The intersection points of the T-shaped lap joints formed between the coiled materials are bonded through the covering strips, the lap joint positions of the internal and external corners are bonded through the covering strips, it is guaranteed that no gap or water seepage point exists at the splicing position, the overall waterproof performance is guaranteed, on the vertical face or the inclined face, the coiled materials and the cushion layer are fixed through the pasting pieces, hollowing of the side vertical face is avoided, and the service life of the coiled materials is prolonged. The layered pouring of the concrete prevents the concrete from directly impacting the vertical surface or the inclined surface to prevent the waterproof coiled material from falling off or bonding and separating, so that the construction quality is ensured, the construction quality of the pre-paved anti-sticking anti-coiled material of the foundation slab is improved, and the protection of finished products is enhanced.
本发明涉及建筑施工技术领域,具体是一种基础底板预铺反粘防水卷材施工质量控制方法。在卷材之间形成的T型搭接缝的交点处使用盖口条进行粘连、阴阳角处的搭接位置使用盖口条进行粘连保证了拼接部位不存在缝隙和渗水点,确保整体的防水性能,立面或斜面上,卷材与垫层之间通过粘贴件相固定,避免侧立面出现空鼓,混凝土分层浇筑避免混凝土直接冲击立面或斜面防水,造成防水卷材脱落或粘接脱离,确保施工质量,提高了提高基础底板预铺反粘防卷材施工质量,加强成品保护。
Foundation bottom plate pre-paving anti-sticking waterproof roll construction quality control method
The invention relates to the technical field of building construction, in particular to a construction quality control method for pre-paving and anti-sticking waterproof coiled materials on a foundation slab. The intersection points of the T-shaped lap joints formed between the coiled materials are bonded through the covering strips, the lap joint positions of the internal and external corners are bonded through the covering strips, it is guaranteed that no gap or water seepage point exists at the splicing position, the overall waterproof performance is guaranteed, on the vertical face or the inclined face, the coiled materials and the cushion layer are fixed through the pasting pieces, hollowing of the side vertical face is avoided, and the service life of the coiled materials is prolonged. The layered pouring of the concrete prevents the concrete from directly impacting the vertical surface or the inclined surface to prevent the waterproof coiled material from falling off or bonding and separating, so that the construction quality is ensured, the construction quality of the pre-paved anti-sticking anti-coiled material of the foundation slab is improved, and the protection of finished products is enhanced.
本发明涉及建筑施工技术领域,具体是一种基础底板预铺反粘防水卷材施工质量控制方法。在卷材之间形成的T型搭接缝的交点处使用盖口条进行粘连、阴阳角处的搭接位置使用盖口条进行粘连保证了拼接部位不存在缝隙和渗水点,确保整体的防水性能,立面或斜面上,卷材与垫层之间通过粘贴件相固定,避免侧立面出现空鼓,混凝土分层浇筑避免混凝土直接冲击立面或斜面防水,造成防水卷材脱落或粘接脱离,确保施工质量,提高了提高基础底板预铺反粘防卷材施工质量,加强成品保护。
Foundation bottom plate pre-paving anti-sticking waterproof roll construction quality control method
基础底板预铺反粘防水卷材施工质量控制方法
YAN XINJIAN (author) / XUN WENLIANG (author) / WANG CHENGLONG (author)
2023-08-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof roll pre-paving structure and anti-sticking construction method
European Patent Office | 2023
|Pre-paving anti-sticking waterproof structure and construction method
European Patent Office | 2022
|Underground engineering pre-paving anti-sticking waterproof construction method
European Patent Office | 2024
|European Patent Office | 2024
|Post-cast strip pre-paving anti-sticking waterproof construction method
European Patent Office | 2023
|