A platform for research: civil engineering, architecture and urbanism
Glass curtain wall whole-process construction method
The invention provides a glass curtain wall full-process construction method, and belongs to the technical field of glass curtain walls, the glass curtain wall full-process construction method comprises the following steps: determining an initial stress spot; installing a pressure regulating device; the transverse keels and the vertical keels are spliced and assembled to form an expanded keel frame shaped like a Chinese character'tian '; a glass plate is installed on the keel frame, the lower end of the glass plate abuts against the pressure adjusting device, and the glass plate is fixed through a fixing structure; adjusting the height of the pressure adjusting device to be proper, and further adjusting the pressure device according to the similarity of the stress spots on the initial image set; gaps among the glass plates, the adjusting transverse keels and the adjusting vertical keels are filled with rubber strips and sealants; and dust and sundries on the surfaces of the transverse keels, the vertical keels and the glass plates are cleaned. According to the method, the extrusion force borne by the glass can be considered in the installation process, and the technical problem that if the extrusion force borne by the glass plate is too large, the glass is prone to fragmentation along with time accumulation is avoided.
本发明提供了一种玻璃幕墙全流程施工方法,属于玻璃幕墙技术领域,该玻璃幕墙全流程施工方法包括:确定初始应力斑;安装调压装置;将横龙骨和竖龙骨进行拼接组装,形成扩展田字形的龙骨架;将玻璃板安装在龙骨架上,所述玻璃板的下端与所述调压装置抵接,并利用固定结构对玻璃板进行固定;将调压装置的高度调整到合适,并根据初始图像集上应力斑的相似度对压力装置进行进一步调节;利用橡胶条和密封胶对玻璃板与调节横龙骨、竖龙骨之间的缝隙进行填充;对横龙骨、竖龙骨以及玻璃板表面的灰尘、杂物进行清理。本方法能够在安装过程中考虑到玻璃承受的挤压力,避免了若玻璃板收到的挤压力过大,则会导致随着时间积累,玻璃容易碎裂的技术问题。
Glass curtain wall whole-process construction method
The invention provides a glass curtain wall full-process construction method, and belongs to the technical field of glass curtain walls, the glass curtain wall full-process construction method comprises the following steps: determining an initial stress spot; installing a pressure regulating device; the transverse keels and the vertical keels are spliced and assembled to form an expanded keel frame shaped like a Chinese character'tian '; a glass plate is installed on the keel frame, the lower end of the glass plate abuts against the pressure adjusting device, and the glass plate is fixed through a fixing structure; adjusting the height of the pressure adjusting device to be proper, and further adjusting the pressure device according to the similarity of the stress spots on the initial image set; gaps among the glass plates, the adjusting transverse keels and the adjusting vertical keels are filled with rubber strips and sealants; and dust and sundries on the surfaces of the transverse keels, the vertical keels and the glass plates are cleaned. According to the method, the extrusion force borne by the glass can be considered in the installation process, and the technical problem that if the extrusion force borne by the glass plate is too large, the glass is prone to fragmentation along with time accumulation is avoided.
本发明提供了一种玻璃幕墙全流程施工方法,属于玻璃幕墙技术领域,该玻璃幕墙全流程施工方法包括:确定初始应力斑;安装调压装置;将横龙骨和竖龙骨进行拼接组装,形成扩展田字形的龙骨架;将玻璃板安装在龙骨架上,所述玻璃板的下端与所述调压装置抵接,并利用固定结构对玻璃板进行固定;将调压装置的高度调整到合适,并根据初始图像集上应力斑的相似度对压力装置进行进一步调节;利用橡胶条和密封胶对玻璃板与调节横龙骨、竖龙骨之间的缝隙进行填充;对横龙骨、竖龙骨以及玻璃板表面的灰尘、杂物进行清理。本方法能够在安装过程中考虑到玻璃承受的挤压力,避免了若玻璃板收到的挤压力过大,则会导致随着时间积累,玻璃容易碎裂的技术问题。
Glass curtain wall whole-process construction method
一种玻璃幕墙全流程施工方法
ZHANG YAN (author) / HUANG FEI (author) / GUO LIQING (author) / ZHANG LISHAN (author) / SONG YANG (author) / DO HYEONG-MOO (author) / WANG DAYONG (author)
2023-08-15
Patent
Electronic Resource
Chinese
Glass curtain wall structure and glass curtain wall construction process
European Patent Office | 2024
|Glass curtain wall construction method and glass curtain wall structure
European Patent Office | 2023
|