A platform for research: civil engineering, architecture and urbanism
Lake transition zone reconstruction method
The invention discloses a lake transition zone reconstruction method. The method comprises the steps that firstly, a concrete slope is built; secondly, a gravel layer is laid along the upper surface of the concrete slope; 3, setting an overwater ecological layer, an amphibious ecological layer and an underwater ecological layer according to the water level fluctuation range of the lake; 4, a soil layer is laid on the upper surface of the rubble layer located in the range of the water ecological layer, a plurality of planting pipe preformed holes are reserved at intervals, planting pipe units are detachably installed in the planting pipe preformed holes, planting pipes are filled with water plant seeds and nutritional agents, and a water diversion structure is embedded in the rubble layer; and 5, a plurality of fixing columns are pre-buried on the gravel layer and the concrete layer in the range of the amphibious ecological layer and the underwater ecological layer, a plurality of planting frame units are fixed to the fixing columns respectively, and the planting frame units are filled with amphibious plant seeds and nutritional agents or underwater plant seeds and nutritional agents. The system has the beneficial effects that multiple ecological systems grow cooperatively, and the defect that the system is broken by water flow is overcome.
本发明公开了一种湖泊过渡带重建方法,包括:步骤一、修建混凝土斜坡;步骤二、沿混凝土斜坡上表面铺设碎石层;步骤三、根据湖泊的水位线波动范围设置水上生态层、两栖生态层以及水下生态层;步骤四、位于水上生态层范围的碎石层上表面铺设土壤层,间隔预留多个种植管预留孔,在种植管预孔内可拆卸安装种植管单元,在种植管内填充水上植物种子和营养剂,在碎石层内埋设引水结构;步骤五、位于两栖生态层和水下生态层范围的碎石层以及混凝土层上预埋多个固定柱,将多个种植框单元分别固定于多个固定柱上,在种植框单元内填充两栖植物种子和营养剂或水下植物种子和营养剂。本发明具有多种生态系统的协同生长,以及克服被水流冲断的缺陷有益效果。
Lake transition zone reconstruction method
The invention discloses a lake transition zone reconstruction method. The method comprises the steps that firstly, a concrete slope is built; secondly, a gravel layer is laid along the upper surface of the concrete slope; 3, setting an overwater ecological layer, an amphibious ecological layer and an underwater ecological layer according to the water level fluctuation range of the lake; 4, a soil layer is laid on the upper surface of the rubble layer located in the range of the water ecological layer, a plurality of planting pipe preformed holes are reserved at intervals, planting pipe units are detachably installed in the planting pipe preformed holes, planting pipes are filled with water plant seeds and nutritional agents, and a water diversion structure is embedded in the rubble layer; and 5, a plurality of fixing columns are pre-buried on the gravel layer and the concrete layer in the range of the amphibious ecological layer and the underwater ecological layer, a plurality of planting frame units are fixed to the fixing columns respectively, and the planting frame units are filled with amphibious plant seeds and nutritional agents or underwater plant seeds and nutritional agents. The system has the beneficial effects that multiple ecological systems grow cooperatively, and the defect that the system is broken by water flow is overcome.
本发明公开了一种湖泊过渡带重建方法,包括:步骤一、修建混凝土斜坡;步骤二、沿混凝土斜坡上表面铺设碎石层;步骤三、根据湖泊的水位线波动范围设置水上生态层、两栖生态层以及水下生态层;步骤四、位于水上生态层范围的碎石层上表面铺设土壤层,间隔预留多个种植管预留孔,在种植管预孔内可拆卸安装种植管单元,在种植管内填充水上植物种子和营养剂,在碎石层内埋设引水结构;步骤五、位于两栖生态层和水下生态层范围的碎石层以及混凝土层上预埋多个固定柱,将多个种植框单元分别固定于多个固定柱上,在种植框单元内填充两栖植物种子和营养剂或水下植物种子和营养剂。本发明具有多种生态系统的协同生长,以及克服被水流冲断的缺陷有益效果。
Lake transition zone reconstruction method
湖泊过渡带重建方法
ZHAO LINA (author) / ZHANG YOUSUO (author) / DONG DAOWU (author) / ZHANG LEI (author) / LI DAWEI (author) / LI YANJUN (author) / LIU ZHIJIE (author) / FENG CHEN (author)
2023-08-22
Patent
Electronic Resource
Chinese
Reconstruction of the lake Winnibigoshish dam
Engineering Index Backfile | 1902
British Library Conference Proceedings | 2014
|Compound ecological restoration method for lakeside zone of shallow lake
European Patent Office | 2021
|