A platform for research: civil engineering, architecture and urbanism
Low-space fat groove backfilling construction method and backfilling block used for low-space fat groove backfilling construction method
The invention discloses a low-space fat groove backfilling construction method and a backfilling block used for the low-space fat groove backfilling construction method. The low-space fat groove backfilling construction method sequentially comprises the following steps that (1) a structure is protected through a waterproof layer; (2) the ground of the backfill area is leveled; (3) carrying out regional division on the fertilizer groove into a region A and a region B; (4) judging whether a pipeline exists in the area A or not, if yes, executing the step (5), and if not, executing the step (6); (5) manufacturing sub-backfilling blocks; the sub-backfill blocks are placed at the position of the pipeline; then carrying out the step (6); (6) manufacturing a main backfill block; the main backfill block is placed in the area A; (7) backfilling the area B; and (8) backfilling of the area B is completed. The low-space fat groove construction method is high in construction efficiency, can effectively guarantee fat groove backfilling construction, is good in construction effect, greatly reduces cost compared with direct pouring of plain concrete, can support a pipeline, adapts to deformation of the pipeline in a design range, and is good in use effect.
低空间肥槽回填施工方法及用于其的回填块,所述方法依次包括如下步骤:(1)对结构进行防水层保护;(2)对回填区域地面进行整平处理;(3)对肥槽进行区域划分,分为区域A和区域B;(4)判断区域A内是否有管道,如有则进行步骤(5),如无,则进行步骤(6);(5)制作子回填块;将子回填块放置到管道位置;随后进行步骤(6);(6)制作主回填块;将主回填块放置到区域A;(7)回填区域B;(8)区域B回填完成。本发明所述的低空间肥槽施工方法施工效率高,可以有效保证肥槽回填的施工,施工效果好,且相对于使用素混凝土直接浇注,成本大大降低,另外,既可以对管道进行支撑,也适应了管道在设计范围内的变形,使用效果好。
Low-space fat groove backfilling construction method and backfilling block used for low-space fat groove backfilling construction method
The invention discloses a low-space fat groove backfilling construction method and a backfilling block used for the low-space fat groove backfilling construction method. The low-space fat groove backfilling construction method sequentially comprises the following steps that (1) a structure is protected through a waterproof layer; (2) the ground of the backfill area is leveled; (3) carrying out regional division on the fertilizer groove into a region A and a region B; (4) judging whether a pipeline exists in the area A or not, if yes, executing the step (5), and if not, executing the step (6); (5) manufacturing sub-backfilling blocks; the sub-backfill blocks are placed at the position of the pipeline; then carrying out the step (6); (6) manufacturing a main backfill block; the main backfill block is placed in the area A; (7) backfilling the area B; and (8) backfilling of the area B is completed. The low-space fat groove construction method is high in construction efficiency, can effectively guarantee fat groove backfilling construction, is good in construction effect, greatly reduces cost compared with direct pouring of plain concrete, can support a pipeline, adapts to deformation of the pipeline in a design range, and is good in use effect.
低空间肥槽回填施工方法及用于其的回填块,所述方法依次包括如下步骤:(1)对结构进行防水层保护;(2)对回填区域地面进行整平处理;(3)对肥槽进行区域划分,分为区域A和区域B;(4)判断区域A内是否有管道,如有则进行步骤(5),如无,则进行步骤(6);(5)制作子回填块;将子回填块放置到管道位置;随后进行步骤(6);(6)制作主回填块;将主回填块放置到区域A;(7)回填区域B;(8)区域B回填完成。本发明所述的低空间肥槽施工方法施工效率高,可以有效保证肥槽回填的施工,施工效果好,且相对于使用素混凝土直接浇注,成本大大降低,另外,既可以对管道进行支撑,也适应了管道在设计范围内的变形,使用效果好。
Low-space fat groove backfilling construction method and backfilling block used for low-space fat groove backfilling construction method
低空间肥槽回填施工方法及用于其的回填块
CHEN FANGYONG (author) / WANG PENGFEI (author) / ZHANG YIMING (author) / GAO LINHAO (author) / YU FEIFAN (author)
2023-08-22
Patent
Electronic Resource
Chinese
Fertilizer groove backfilling structure and fertilizer groove backfilling method
European Patent Office | 2023
|Fertilizer groove backfilling device and fertilizer groove backfilling method
European Patent Office | 2023
|Foam concrete backfilling fertilizer groove construction method
European Patent Office | 2024
|Groove backfilling construction device and construction process
European Patent Office | 2024
|