Construction method of goods shelf and warehouse shelf integrated warehouse
The invention discloses a construction method of a goods shelf and warehouse shelf integrated warehouse. According to the construction method, multiple columns of foundation bolts are pre-buried in a goods shelf foundation; then an adjusting bottom plate is installed at the position of the foundation bolt, and a plurality of adjusting screw rods are connected to the adjusting bottom plate; then the column bottom plate is installed above the adjusting bottom plate, the adjusting screw rod penetrates through the column bottom plate, the adjusting screw rod is provided with the adjusting nuts above and below the column bottom plate respectively, the two adjusting nuts press the column bottom plate respectively, and the column bottom plate is provided with the column foot plate; then the stand columns are installed on the corresponding column bottom plates and the corresponding column foot plates, and then the cross beams, the supporting rods and the rails are installed to form the goods shelf; and finally, the wallboards, the roof frame and the roof slabs are installed. The goods shelf has the effects that the height precision of the goods shelf is improved, and shaking of the goods shelf in the later use process is reduced.
本申请公开了一种货架库架一体仓库的施工方法,其在货架基础中预埋多列地脚螺栓;然后将调节底板安装到地脚螺栓处,调节底板上连接有多根调节螺杆;之后将柱底板安装到调节底板的上方,调节螺杆贯穿柱底板,调节螺杆于柱底板的上方和下方分别安装有调节螺母,两个调节螺母分别压紧柱底板,柱底板上安装有柱脚板;再将立柱安装到对应的柱底板和柱脚板上,之后安装横梁、支撑杆、轨道,形成货架;最后安装墙板、屋顶架和屋顶板。本申请具有提高货架的高度精度,减少货架在后期使用过程中的晃动的效果。
Construction method of goods shelf and warehouse shelf integrated warehouse
The invention discloses a construction method of a goods shelf and warehouse shelf integrated warehouse. According to the construction method, multiple columns of foundation bolts are pre-buried in a goods shelf foundation; then an adjusting bottom plate is installed at the position of the foundation bolt, and a plurality of adjusting screw rods are connected to the adjusting bottom plate; then the column bottom plate is installed above the adjusting bottom plate, the adjusting screw rod penetrates through the column bottom plate, the adjusting screw rod is provided with the adjusting nuts above and below the column bottom plate respectively, the two adjusting nuts press the column bottom plate respectively, and the column bottom plate is provided with the column foot plate; then the stand columns are installed on the corresponding column bottom plates and the corresponding column foot plates, and then the cross beams, the supporting rods and the rails are installed to form the goods shelf; and finally, the wallboards, the roof frame and the roof slabs are installed. The goods shelf has the effects that the height precision of the goods shelf is improved, and shaking of the goods shelf in the later use process is reduced.
本申请公开了一种货架库架一体仓库的施工方法,其在货架基础中预埋多列地脚螺栓;然后将调节底板安装到地脚螺栓处,调节底板上连接有多根调节螺杆;之后将柱底板安装到调节底板的上方,调节螺杆贯穿柱底板,调节螺杆于柱底板的上方和下方分别安装有调节螺母,两个调节螺母分别压紧柱底板,柱底板上安装有柱脚板;再将立柱安装到对应的柱底板和柱脚板上,之后安装横梁、支撑杆、轨道,形成货架;最后安装墙板、屋顶架和屋顶板。本申请具有提高货架的高度精度,减少货架在后期使用过程中的晃动的效果。
Construction method of goods shelf and warehouse shelf integrated warehouse
一种货架库架一体仓库的施工方法
LI RONG (author) / LI MING (author) / ZHONG GUANGHUI (author) / LONG JIANWEN (author)
2023-08-22
Patent
Electronic Resource
Chinese
High position stereo shelf warehouse super-flat terrace construction technology
European Patent Office | 2015
|Goods carrying vehicle for warehouse logistics warehouse
European Patent Office | 2023
|European Patent Office | 2022
|Storage warehouse and storage method for prolonging shelf life of jasmine tea
European Patent Office | 2024
|