A platform for research: civil engineering, architecture and urbanism
Integral prefabricated ditch mounting and adjusting device
The invention discloses an integral type prefabricated ditch installation adjusting device. The device comprises a horizontal adjusting device 1, a vertical adjusting device 2 and a laser horizontal centering device 3. The step 1 comprises rotating a horizontal adjusting handle, driving a horizontal rod to move in parallel through threads on the inner side of a bearing, and connecting the prefabricated ditch with a drawstring so as to adjust the horizontal movement of the prefabricated ditch. The step 2 comprises the steps that a foot-stepping type pneumatic pump lifting adjusting device is used for lifting and lowering a vertical rod through inflation and deflation, and the prefabricated ditch is adjusted to move vertically. And the step 3 comprises the steps that laser is aligned with the middle line of the lofted and marked template through adjustment in the steps 1 and 2, so that the ditch is more accurately and rapidly installed. The method has the characteristics of simplicity in operation, great reduction of equipment and human input, mature technology, safety, reliability and high efficiency.
本发明公开一种整体式预制水沟安装调节装置,该装置包括1、水平调节装置:2、竖向调节装置:3、激光水平对中装置。步骤1包括:旋转水平调节把手,通过轴承内侧螺纹带动水平杆平行移动,用拉带连接预制水沟,从而调节预制水沟水平移动。步骤2包括:脚踩式气压泵升降调节装置,通过充气及放气使竖向杆升高及降低,调节预制水沟竖向移动。步骤3包括:通过步骤1、2调节使激光对准已放样标记好的模板中线,让水沟安装更加精准、快速。本发明具有操作简单、大幅减少设备和人力投入、技术成熟、安全可靠、高效的特点。
Integral prefabricated ditch mounting and adjusting device
The invention discloses an integral type prefabricated ditch installation adjusting device. The device comprises a horizontal adjusting device 1, a vertical adjusting device 2 and a laser horizontal centering device 3. The step 1 comprises rotating a horizontal adjusting handle, driving a horizontal rod to move in parallel through threads on the inner side of a bearing, and connecting the prefabricated ditch with a drawstring so as to adjust the horizontal movement of the prefabricated ditch. The step 2 comprises the steps that a foot-stepping type pneumatic pump lifting adjusting device is used for lifting and lowering a vertical rod through inflation and deflation, and the prefabricated ditch is adjusted to move vertically. And the step 3 comprises the steps that laser is aligned with the middle line of the lofted and marked template through adjustment in the steps 1 and 2, so that the ditch is more accurately and rapidly installed. The method has the characteristics of simplicity in operation, great reduction of equipment and human input, mature technology, safety, reliability and high efficiency.
本发明公开一种整体式预制水沟安装调节装置,该装置包括1、水平调节装置:2、竖向调节装置:3、激光水平对中装置。步骤1包括:旋转水平调节把手,通过轴承内侧螺纹带动水平杆平行移动,用拉带连接预制水沟,从而调节预制水沟水平移动。步骤2包括:脚踩式气压泵升降调节装置,通过充气及放气使竖向杆升高及降低,调节预制水沟竖向移动。步骤3包括:通过步骤1、2调节使激光对准已放样标记好的模板中线,让水沟安装更加精准、快速。本发明具有操作简单、大幅减少设备和人力投入、技术成熟、安全可靠、高效的特点。
Integral prefabricated ditch mounting and adjusting device
一种整体式预制水沟安装调节装置
WU GUIFA (author) / BU ZHUQING (author) / WANG JINJIN (author) / ZHANG LIANG (author) / SU WU (author) / ZHOU JIAN (author) / YANG JIALIN (author)
2023-08-25
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Circulation type prefabricated concrete water collecting ditch side wall mounting method
European Patent Office | 2021
|European Patent Office | 2023
|