A platform for research: civil engineering, architecture and urbanism
Jacking level bridge for nuclear island plant and jacking method of jacking level bridge
The invention discloses a jacking level bridge for a nuclear island plant and a jacking method.The jacking level bridge for the nuclear island plant comprises a bridge body assembly and a level bridge assembly, and the bridge body assembly comprises a plurality of bridge body standard knots; the flat bridge assembly comprises a plurality of construction flat bridges, each construction flat bridge comprises a jacking sleeve frame, a front bridge and a rear bridge, and each jacking sleeve frame comprises a frame body and a driving part; wherein the frame body of one construction level bridge is arranged on the periphery of the uppermost bridge body standard section in a sleeving mode and detachably connected with the uppermost bridge body standard section, and the frame bodies of the other construction level bridges are vertically arranged at intervals, arranged on the periphery of any bridge body standard section in a sleeving mode and detachably connected with the bridge body standard section; a walkway is arranged on the periphery of each frame body, and a construction platform is formed on the front axle; the driving piece is used for jacking up the front axle. According to the jacking level bridge for the nuclear island plant, the bridge body assembly is located outside the nuclear island plant, the situation that people walking on the ground are blocked is avoided, then unnecessary time waste is avoided, and the working efficiency is improved.
本发明公开了一种用于核岛厂房的顶升平桥及其顶升方法,其中,用于核岛厂房的顶升平桥包括桥身组件和平桥组件,桥身组件包括多个桥身标准节;平桥组件包括多个施工平桥,各施工平桥包括顶升套架、前桥和后桥,顶升套架包括框体和驱动件;其中一个施工平桥的框体套设于位于最上方的桥身标准节外周并与其可拆卸连接,其余的施工平桥的框体竖向间隔设置并分别套设于任意一个桥身标准节外周并与其可拆卸连接;各框体的外周设置有走道,且前桥形成有施工平台;驱动件用于将前桥顶起。本发明用于核岛厂房的顶升平桥的桥身组件位于核岛厂房外,避免了出现会阻挡在地面行走的人员的情况,进而避免了不必要的时间的浪费,提高了工作效率。
Jacking level bridge for nuclear island plant and jacking method of jacking level bridge
The invention discloses a jacking level bridge for a nuclear island plant and a jacking method.The jacking level bridge for the nuclear island plant comprises a bridge body assembly and a level bridge assembly, and the bridge body assembly comprises a plurality of bridge body standard knots; the flat bridge assembly comprises a plurality of construction flat bridges, each construction flat bridge comprises a jacking sleeve frame, a front bridge and a rear bridge, and each jacking sleeve frame comprises a frame body and a driving part; wherein the frame body of one construction level bridge is arranged on the periphery of the uppermost bridge body standard section in a sleeving mode and detachably connected with the uppermost bridge body standard section, and the frame bodies of the other construction level bridges are vertically arranged at intervals, arranged on the periphery of any bridge body standard section in a sleeving mode and detachably connected with the bridge body standard section; a walkway is arranged on the periphery of each frame body, and a construction platform is formed on the front axle; the driving piece is used for jacking up the front axle. According to the jacking level bridge for the nuclear island plant, the bridge body assembly is located outside the nuclear island plant, the situation that people walking on the ground are blocked is avoided, then unnecessary time waste is avoided, and the working efficiency is improved.
本发明公开了一种用于核岛厂房的顶升平桥及其顶升方法,其中,用于核岛厂房的顶升平桥包括桥身组件和平桥组件,桥身组件包括多个桥身标准节;平桥组件包括多个施工平桥,各施工平桥包括顶升套架、前桥和后桥,顶升套架包括框体和驱动件;其中一个施工平桥的框体套设于位于最上方的桥身标准节外周并与其可拆卸连接,其余的施工平桥的框体竖向间隔设置并分别套设于任意一个桥身标准节外周并与其可拆卸连接;各框体的外周设置有走道,且前桥形成有施工平台;驱动件用于将前桥顶起。本发明用于核岛厂房的顶升平桥的桥身组件位于核岛厂房外,避免了出现会阻挡在地面行走的人员的情况,进而避免了不必要的时间的浪费,提高了工作效率。
Jacking level bridge for nuclear island plant and jacking method of jacking level bridge
用于核岛厂房的顶升平桥及其顶升方法
LIU JUN (author) / WANG DONG (author) / ZHAO WEI (author) / TIAN GUOCHENG (author) / ZHAO ZHIHAI (author) / DENG LIANGWEN (author) / LIU YU (author) / LIANG PENGWEI (author) / LU HONGWEI (author) / QU DIANYING (author)
2023-08-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
British Library Conference Proceedings | 1998
|Continuous bridge jacking device and jacking method thereof
European Patent Office | 2024
|Continuous bridge jacking device and jacking method thereof
European Patent Office | 2024
|Bridge continuous jacking system and jacking construction method
European Patent Office | 2023
|