A platform for research: civil engineering, architecture and urbanism
Prestress-interlocked bank slope repairing structure and construction method thereof
The invention discloses a pre-stress linkage bank slope repairing structure and a construction method thereof.The pre-stress linkage bank slope repairing structure comprises a plurality of slope protection bricks which are sequentially connected and interlocked, each slope protection brick is of a polyhedral structure and comprises a first side face, a second side face, a third side face, a fourth side face, a fifth side face and a sixth side face which are sequentially connected, the first side face and the fourth side face, the second side face and the sixth side face, and the third side face and the fifth side face are oppositely arranged, a first protruding buckle is arranged on the first side face, a first groove matched with the first buckle is correspondingly formed in the fourth side face, a second protruding buckle is arranged on the fifth side face, and a second groove matched with the second buckle is correspondingly formed in the fourth side face. Second grooves matched with the second buckles are correspondingly formed in the third side faces, and every two adjacent slope protection bricks are connected through the buckle grooves. The waste concrete in the construction waste is recycled, and the purposes of saving energy, protecting the environment, being low in manufacturing cost, being simple and convenient to construct, reducing the treatment pressure of the construction waste and relieving the problem of stacking and occupying land are achieved.
本发明公开了一种预应力连锁的岸坡修护结构及其构建方法,包括多个依次连接并互锁的护坡砖,护坡砖为多面体结构,其包括依次连接的第一侧面、第二侧面、第三侧面、第四侧面、第五侧面以及第六侧面,其中,第一侧面与第四侧面、第二侧面与第六侧面、第三侧面与第五侧面相对设置,在第一侧面上设置有凸起的第一卡扣,对应地在第四侧面上设置有与所述第一卡扣适配的第一凹槽,在第五侧面上设置有凸起的第二卡扣,对应地在第三侧面上设置有与所述第二卡扣适配的第二凹槽,相邻两两护坡砖通过卡扣凹槽连接。本发明回收利用建筑垃圾中的废旧混凝土,实现了节能环保、造价较低、施工简便、减少建筑废弃物处理压力与缓解堆积占地问题的目的。
Prestress-interlocked bank slope repairing structure and construction method thereof
The invention discloses a pre-stress linkage bank slope repairing structure and a construction method thereof.The pre-stress linkage bank slope repairing structure comprises a plurality of slope protection bricks which are sequentially connected and interlocked, each slope protection brick is of a polyhedral structure and comprises a first side face, a second side face, a third side face, a fourth side face, a fifth side face and a sixth side face which are sequentially connected, the first side face and the fourth side face, the second side face and the sixth side face, and the third side face and the fifth side face are oppositely arranged, a first protruding buckle is arranged on the first side face, a first groove matched with the first buckle is correspondingly formed in the fourth side face, a second protruding buckle is arranged on the fifth side face, and a second groove matched with the second buckle is correspondingly formed in the fourth side face. Second grooves matched with the second buckles are correspondingly formed in the third side faces, and every two adjacent slope protection bricks are connected through the buckle grooves. The waste concrete in the construction waste is recycled, and the purposes of saving energy, protecting the environment, being low in manufacturing cost, being simple and convenient to construct, reducing the treatment pressure of the construction waste and relieving the problem of stacking and occupying land are achieved.
本发明公开了一种预应力连锁的岸坡修护结构及其构建方法,包括多个依次连接并互锁的护坡砖,护坡砖为多面体结构,其包括依次连接的第一侧面、第二侧面、第三侧面、第四侧面、第五侧面以及第六侧面,其中,第一侧面与第四侧面、第二侧面与第六侧面、第三侧面与第五侧面相对设置,在第一侧面上设置有凸起的第一卡扣,对应地在第四侧面上设置有与所述第一卡扣适配的第一凹槽,在第五侧面上设置有凸起的第二卡扣,对应地在第三侧面上设置有与所述第二卡扣适配的第二凹槽,相邻两两护坡砖通过卡扣凹槽连接。本发明回收利用建筑垃圾中的废旧混凝土,实现了节能环保、造价较低、施工简便、减少建筑废弃物处理压力与缓解堆积占地问题的目的。
Prestress-interlocked bank slope repairing structure and construction method thereof
预应力连锁的岸坡修护结构及其构建方法
TAO GAOLIANG (author) / YANG CHUANHUI (author) / XIAO HENGLIN (author) / WAN JUAN (author) / HUANG SHAOPING (author) / ZHU ZHIZHENG (author) / MAO NONG (author) / TANG WENXING (author) / GUO LINGSAN (author) / ZHOU HENGJIE (author)
2023-08-29
Patent
Electronic Resource
Chinese
Prestress assembly frame structure and construction method thereof
European Patent Office | 2020
|European Patent Office | 2015
|Beam end prestress structure and construction method thereof
European Patent Office | 2020
|Ecological repairing structure of river and lake bank slope
European Patent Office | 2022
|