A platform for research: civil engineering, architecture and urbanism
Fabricated outer wall structure
The invention discloses an assembly type outer wall structure, relates to the field of outer wall assembly, solves the problems that when an existing assembly type outer wall structure is used, a hanging ring is difficult to be fixed to the upper end of an outer wall in a pre-installation mode and is automatically separated from a wall body after being hoisted, and comprises the wall body, a hoisting mechanism, a control mechanism and a triggering mechanism. A plurality of groups of positioning holes are formed in the bottom surface of the wall body, the hoisting mechanism comprises a hoisting hook, the control mechanism comprises a control rod, and the trigger mechanism comprises a supporting block. And when the embedded steel bars are inserted into the positioning holes, the control rods are pushed to move upwards to generate stored force, and the stored force of the control mechanisms is triggered to be relieved through the triggering mechanisms after the diagonal draw bars and the supporting blocks are tightly supported, so that the hoisting mechanisms are completely separated from the wall, and the purpose of automatic separation is achieved.
本发明公开了一种装配式外墙结构,涉及外墙装配领域,解决了现有装配式外墙结构使用时吊环难以通过预先安装的方式固定在外墙上端,并在吊装完成后自动脱离墙体的问题,包括墙体、吊装机构、控制机构和触发机构,墙体底面开设有多组定位孔,吊装机构包括吊钩,控制机构包括控制杆,触发机构包括支撑块,此装配式外墙结构,便于通过将吊钩吊起辅助将墙体吊装至合适位置进行安装,通过控制机构将吊装机构固定在墙体上,并在预埋钢筋插入定位孔时,推动控制杆上移产生蓄力,通过触发机构在斜拉杆与支撑块进行紧密支撑后触发解除控制机构的蓄力,从而使得吊装机构完全脱离墙体,完成自动脱离的目的。
Fabricated outer wall structure
The invention discloses an assembly type outer wall structure, relates to the field of outer wall assembly, solves the problems that when an existing assembly type outer wall structure is used, a hanging ring is difficult to be fixed to the upper end of an outer wall in a pre-installation mode and is automatically separated from a wall body after being hoisted, and comprises the wall body, a hoisting mechanism, a control mechanism and a triggering mechanism. A plurality of groups of positioning holes are formed in the bottom surface of the wall body, the hoisting mechanism comprises a hoisting hook, the control mechanism comprises a control rod, and the trigger mechanism comprises a supporting block. And when the embedded steel bars are inserted into the positioning holes, the control rods are pushed to move upwards to generate stored force, and the stored force of the control mechanisms is triggered to be relieved through the triggering mechanisms after the diagonal draw bars and the supporting blocks are tightly supported, so that the hoisting mechanisms are completely separated from the wall, and the purpose of automatic separation is achieved.
本发明公开了一种装配式外墙结构,涉及外墙装配领域,解决了现有装配式外墙结构使用时吊环难以通过预先安装的方式固定在外墙上端,并在吊装完成后自动脱离墙体的问题,包括墙体、吊装机构、控制机构和触发机构,墙体底面开设有多组定位孔,吊装机构包括吊钩,控制机构包括控制杆,触发机构包括支撑块,此装配式外墙结构,便于通过将吊钩吊起辅助将墙体吊装至合适位置进行安装,通过控制机构将吊装机构固定在墙体上,并在预埋钢筋插入定位孔时,推动控制杆上移产生蓄力,通过触发机构在斜拉杆与支撑块进行紧密支撑后触发解除控制机构的蓄力,从而使得吊装机构完全脱离墙体,完成自动脱离的目的。
Fabricated outer wall structure
一种装配式外墙结构
XU JINGFENG (author) / LIU XIAOHU (author) / WU JING (author) / WANG JINXIA (author) / YANG XIN (author) / DUAN BIXIN (author) / WANG QIAN (author) / FENG XUEKE (author) / ZHAO XUEQING (author)
2023-08-29
Patent
Electronic Resource
Chinese