A platform for research: civil engineering, architecture and urbanism
Split mounting type double-layer steel plate composite shear wall achieving double-face compression
The invention relates to the technical field of building structures, and discloses a split mounting type double-layer steel plate combined shear wall achieving double-face compression, the split mounting type double-layer steel plate combined shear wall comprises an upper wall body and a lower wall body, the lower wall body is located below the upper wall body, and a plurality of reinforcing plates are fixedly connected to the interiors of the lower wall body and the upper wall body. According to the split mounting type double-layer steel plate composite shear wall achieving double-face compression, during splicing, the inserting blocks on the lower connecting blocks at the bottom of the upper wall body are inserted into the corresponding inserting grooves in the upper connecting blocks, at the moment, the inserting blocks at the bottoms of the upper connecting blocks can be inserted into the inserting grooves in the bottoms of the lower connecting blocks, and therefore double-layer locking is achieved, and the connecting stability is enhanced; the upper wall body and the lower wall bodies are installed by inserting the inserting rods along the second inserting holes, then the lower wall bodies are connected according to needs, the reinforcing plates and the embedded steel bars are arranged in the upper wall body and the lower wall bodies, the stability of the structure is improved, the strength of the wall bodies is enhanced, splicing of the shear wall can be rapidly completed through the structure, and machining and transportation are convenient.
本发明涉及建筑结构技术领域,且公开了一种拼装式实现双面受压的双层钢板组合剪力墙,包括上墙体和下墙体,所述下墙体位于上墙体的下方,所述下墙体和上墙体的内部均固定连接有若干个加强板。该种拼装式实现双面受压的双层钢板组合剪力墙,拼接时将上墙体底部下连接块上的插块插入上连接块上对应的插槽内,此时上连接块底部的插块会插入下连接块底部的插槽内,以此实现双层锁紧,加强连接的稳定性,再将插杆沿着插孔二插入便完成对上墙体和下墙体的安装,再根据需要连接若干个下墙体即可,上墙体与下墙体内均有加强板和预埋钢筋,提高结构的稳定性,加强墙体的强度,通过该结构能够快速完成对剪力墙的拼接,便于加工和运输。
Split mounting type double-layer steel plate composite shear wall achieving double-face compression
The invention relates to the technical field of building structures, and discloses a split mounting type double-layer steel plate combined shear wall achieving double-face compression, the split mounting type double-layer steel plate combined shear wall comprises an upper wall body and a lower wall body, the lower wall body is located below the upper wall body, and a plurality of reinforcing plates are fixedly connected to the interiors of the lower wall body and the upper wall body. According to the split mounting type double-layer steel plate composite shear wall achieving double-face compression, during splicing, the inserting blocks on the lower connecting blocks at the bottom of the upper wall body are inserted into the corresponding inserting grooves in the upper connecting blocks, at the moment, the inserting blocks at the bottoms of the upper connecting blocks can be inserted into the inserting grooves in the bottoms of the lower connecting blocks, and therefore double-layer locking is achieved, and the connecting stability is enhanced; the upper wall body and the lower wall bodies are installed by inserting the inserting rods along the second inserting holes, then the lower wall bodies are connected according to needs, the reinforcing plates and the embedded steel bars are arranged in the upper wall body and the lower wall bodies, the stability of the structure is improved, the strength of the wall bodies is enhanced, splicing of the shear wall can be rapidly completed through the structure, and machining and transportation are convenient.
本发明涉及建筑结构技术领域,且公开了一种拼装式实现双面受压的双层钢板组合剪力墙,包括上墙体和下墙体,所述下墙体位于上墙体的下方,所述下墙体和上墙体的内部均固定连接有若干个加强板。该种拼装式实现双面受压的双层钢板组合剪力墙,拼接时将上墙体底部下连接块上的插块插入上连接块上对应的插槽内,此时上连接块底部的插块会插入下连接块底部的插槽内,以此实现双层锁紧,加强连接的稳定性,再将插杆沿着插孔二插入便完成对上墙体和下墙体的安装,再根据需要连接若干个下墙体即可,上墙体与下墙体内均有加强板和预埋钢筋,提高结构的稳定性,加强墙体的强度,通过该结构能够快速完成对剪力墙的拼接,便于加工和运输。
Split mounting type double-layer steel plate composite shear wall achieving double-face compression
一种拼装式实现双面受压的双层钢板组合剪力墙
SHANG XIAOBO (author) / LUO LONG (author) / RUAN HAIYAN (author) / WU ZHENGUO (author) / YIN XINYU (author)
2023-08-29
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Split mounting type double-layer composite floor and manufacturing process
European Patent Office | 2023
|European Patent Office | 2022
|Built-in densely-distributed column type double-layer corrugated steel plate composite shear wall
European Patent Office | 2022
|Thin-wall double-steel-plate concrete composite shear wall structure
European Patent Office | 2023
|